Directory › China › Ulanqab › GLP Ulanqab GW-class Green Power Intelligent Computing Base (普洛斯乌兰察布GW级源网荷储一体化智算产业基地)

GLP Ulanqab GW-class Green Power Intelligent Computing Base (普洛斯乌兰察布GW级源网荷储一体化智算产业基地) data center

Ulanqab, Inner Mongolia, China · Ulanqab market · location approximate to district level

Also listed as 普洛斯 乌兰察布, GLP Ulanqab and 普洛斯 察右中旗.

GLP Ulanqab GW-class Green Power Intelligent Computing Base (普洛斯乌兰察布GW级源网荷储一体化智算产业基地) is a data center project in Ulanqab, China, operated by GLP (普洛斯). It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as announced on 8 July 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
GLP (普洛斯)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot0 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and GLP Ulanqab GW-class Green Power Intelligent Computing Base (普洛斯乌兰察布GW级源网荷储一体化智算产业基地) has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

It is the only GLP project ArusGrid tracks. It sits on the Chahar Right Middle Banner big data industrial park. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 8 July 2026. Power comes from GLP group new energy business (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 13 October 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Planned as a GW-class green-power intelligent computing (智算) base. No AI tenant named.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2026-07-08Announced · m.thepaper.cn

Who is behind it

OperatorGLP (普洛斯) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Power allocation or planGLP group new energy business · Jul 2026 Reported source ↗
Planned as a green power base using an integrated source, grid, load and storage model for on-site use of green electricity. GLP's own new energy business is to supply it. · No generation capacity, mix or voltage was given. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 普洛斯与乌兰察布市政府签署战略合作协议,建造GW级源网荷储一体化智算产业基地 (澎湃新闻, 2026-07-09)
  2. 乌兰察布,DeepSeek在这寻找最便宜的Token (IT时报, via 虎嗅网, 2026-09-16)
  3. 北方小城化身中国最热AI工地!近3万建设工人 Deepseek梁文锋在此砸下400亿 (快科技, via 凤凰网, 2026-10-13)
  4. 助力“算力网”建设 普洛斯在乌兰察布打造吉瓦级绿电智算产业基地 (Xinhua Finance (新华财经), 2026-07-10)
  5. 梁文锋投400亿,乌兰察布被AI巨头挤爆了 (投资界 (from 铅笔道), 2026-10-13)

More in Ulanqab

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.