Envision Ulanqab Xinghe (Galaxy) Base data center

Ulanqab, Inner Mongolia, China · Ulanqab market · location approximate to city level

Also listed as 远景乌兰察布星河基地, Envision Galaxy Campus, 远景数据, 远景智算 and 新远景智算.

Envision Ulanqab Xinghe (Galaxy) Base is a data center project in Ulanqab, China, operated by Envision Group (远景科技集团). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as operational on 6 August 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Envision Group (远景科技集团)
Local developer
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and Envision Ulanqab Xinghe (Galaxy) Base has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

It is the only Envision project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as operational on 6 August 2026. Power comes from Envision green power (direct supply) through a renewable power purchase agreement (reported, unconfirmed).

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 12 August 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

It was commissioned in August 2026 as an AI supercomputing unit with million-card parallel capability and a million-PFLOPS compute scale (Envision release via Yicai and QbitAI).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2026-08-06Operational · yicai.com

Who is behind it

OperatorEnvision Group (远景科技集团) · Local developer

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Renewable power dealEnvision green power (direct supply) · 160 MW · Aug 2026 Reported source ↗
About 80% direct green power. · 160MW power supply capability at commissioning; not IT load.
Own generationEnvision (self built wind and solar) · 2,000 MW · Aug 2026 Reported source ↗
High share green power via self built wind and solar plants and dedicated lines, with storage · 2GW is total planned power capacity of the park, not IT load. Solid state transformers convert 10kV or 13.8kV AC to 800V DC · Applies to the whole campus.

Sources checked 2026-10-19

  1. 远景科技乌兰察布超级算力枢纽投产,总规划电力容量2GW (Yicai, 2026-08-06)
  2. 远景乌兰察布星河基地投产 (QbitAI, 2026-08-06)
  3. Inside Envision's 2GW Green AI Data Centre in Ulanqab, China (Data Centre Magazine, 2026-08-10)
  4. 全球最大,单体智算中心投产 (财联社/央视财经 via 新浪财经, 2026-08-12)
  5. 远景科技乌兰察布超级算力枢纽投产,总规划电力容量2GW (第一财经 via 网易, 2026-08-06)

More in Ulanqab

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.