Alibaba Cloud Ulanqab Data Center is a data center project in Ulanqab, China, operated by Alibaba Cloud (阿里云). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to expanding on 1 September 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Alibaba Cloud (阿里云)
Hyperscaler self-build
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and Alibaba Cloud Ulanqab Data Center has no published figure so it sits outside that ranking. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

Alibaba has 4 others in China tracked by ArusGrid, including Alibaba YRD Intelligent Computing Base (阿里巴巴长三角智能计算基地), Alibaba Cloud Western Cloud Computing Center and Data Service Base and Alibaba Cloud Xuanhua Data Centre (阿里云宣化数据中心). It sits on the Alibaba Ulanqab campus. The named user of the compute is XPeng Motors (reported, unconfirmed).

The dated record runs from operational on 8 June 2020 to operational and expanding on 1 September 2026. The money on record is CN¥3bn as of September 2023, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 12 October 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Alibaba launched Lingjun Zhenwu M890 supernode instances on 2026-08-12, sold first from Ulanqab (10jqka, 2026-08-13). Staff told Beijing News that no accelerator card is idle.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2020-06-08Operational · news.qq.com
2026-09-01Expanding · bjnews.com.cn

Who is behind it

OperatorAlibaba Cloud (阿里云) · Hyperscaler self-build

Who uses the compute

Runs compute here · enterpriseXPeng Motors · reported, unconfirmed

as of 2023-09-01

Alibaba Cloud and XPeng jointly built the Fuyao autonomous-driving intelligent computing centre in Ulanqab. The building is not named.

Source · 分析丨大厂数据中心纷纷落地,算力的出路在乌兰察布? (Tencent News, 2023-09-01)

Money at this site

Announced investment, 2023-09CN¥3bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. 分析丨大厂数据中心纷纷落地,算力的出路在乌兰察布? (Tencent News, 2023-09-01)
  2. 乌兰察布为何成AI算力新枢纽?实探:阿里云超节点实例率先落地 (10jqka, 2026-08-13)
  3. 时延4毫秒、电价三毛五:AI的“大脑”为什么长在草原上? (Beijing News, 2026-09-01)
  4. In Depth: How a Windswept City in North China Became an AI Powerhouse (Caixin Global, 2026-08-14)
  5. 世界算力竞逐,内蒙古何以崛起? (Xinhua Daily Telegraph (新华每日电讯), 2026-10-12)
  6. 总投资约66亿!内蒙古6个算力项目(变更)备案获批,涉及阿里、华为云、中国联通等 (新浪财经, 2026-03-24)

More in Ulanqab

Also run by Alibaba

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.