China · dataset updated 2026-10-18

ArusGrid tracks 4 active data center projects operated by Zhonglian Data Group, with 600 MW of planned IT load, across China. Of these, 3 are under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 600 MW.

ArusGrid classes the operator as colocation. Projects appear under the names Ningxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司), Zhonglian Data Group (中联数据集团), Zhonglian Data Group (中联数据集团), via Guangdong Zhonglian Yungang Data Services (广东中联云港数据服务有限公司) and Zhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司). The largest project is Zhonglian Zero-Carbon AI Computing Park (Cloud Base) at 600 MW in Zhongwei, under construction. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Zhonglian Zero-Carbon AI Computing Park (Cloud Base)ZhongweiUnder construction600undisclosedZhonglian Data Group (中联数据集团)Likely
Zhonglian Data South China HQ and South China Computing Centre, Shaoguan (中联数据华南总部暨华南算力中心项目)Zhenjiang Industrial Park, Shaoguan High-tech ZoneUnder construction63,200 racks *undisclosedZhonglian Data Group (中联数据集团), via Guangdong Zhonglian Yungang Data Services (广东中联云港数据服务有限公司)No signal either way
Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目)UlanqabUnder construction11,500 racks *undisclosedZhonglian Data Group (中联数据集团), via Inner Mongolia Yaxin Yunlian Intelligent Computing Data Technology (内蒙古亚信云联智算数据科技有限公司)Likely
Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone AZhongweiLand and permittingnone publishedundisclosedNingxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司)Likely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.