Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A

Zhongwei, Ningxia, China · Zhongwei market · location approximate to city level

Also listed as 中联零碳智算(宣和)产业园A区.

Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A is a data center project in Zhongwei, China, operated by Ningxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 1 July 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Ningxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

Zhonglian Data Group has 3 others in China tracked by ArusGrid, including Zhonglian Zero-Carbon AI Computing Park (Cloud Base), Zhonglian Data South China HQ and South China Computing Centre, Shaoguan (中联数据华南总部暨华南算力中心项目) and Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 1 July 2025.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 17 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Named a zero-carbon AI computing (零碳智算) park and permitted for 16kW cabinets. No AI tenant is named.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2025-07-01Land and permitting · nxzw.gov.cn

Who is behind it

OperatorNingxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated byZhongwei Municipal People's Government (中卫市人民政府) · 169,536 sqm · Jul 2025 Confirmed source ↗
Approval 卫政土批字〔2025〕17号.

Sources checked 2026-10-19

  1. 中联零碳智算(宣和)产业园A区项目规划设计方案批前公示 (中卫市自然资源局, 2025-06-05)
  2. 中联零碳智算(宣和)产业园A区项目 建设用地规划许可证证后公示 (中卫市自然资源局, 2025-07-01)
  3. 中联零碳智算(宣和)产业园A区项目(1#-4#数据中心楼、330千伏变电站)建设工程规划许可证证后公示 (中卫市自然资源局, 2025-07-02)
  4. 马秀兰现场办公推进中卫数据中心集群宣和片区建设时强调 紧盯节点倒排工期 打造绿色智能数据中心集群 (中卫市人民政府 (来源:中卫日报), 2026-03-13)
  5. 中联零碳智算 (宣和) 产业园A区项目局部优化调整规划设计方案批前公示 (中卫市自然资源局, 2026-09-17)
  6. 锚定“东数西算”节点城市——中卫聚力打造中国绿色算力之都 (科创中国 (中国科学技术协会), 2025-12-11)
  7. 截至6月 宁夏中卫签约8个超大型智算中心项目 总投资1885亿元 绿电直供数据中心 成就一片投资热土(年中数据微视角) (人民日报 via 东方财富网, 2026-07-28)

More in Zhongwei

Also run by Zhonglian Data Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.