Also listed as 中联零碳智算(宣和)产业园A区.
Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A is a data center project in Zhongwei, China, operated by Ningxia Western Intelligent Computing Big Data Technology (宁夏西部智算大数据科技有限公司). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as land and permitting on 1 July 2025. Record last checked against its sources on 19 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and Zhonglian Zero-Carbon AI Computing Park (Xuanhe), Zone A has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.
Zhonglian Data Group has 3 others in China tracked by ArusGrid, including Zhonglian Zero-Carbon AI Computing Park (Cloud Base), Zhonglian Data South China HQ and South China Computing Centre, Shaoguan (中联数据华南总部暨华南算力中心项目) and Inner Mongolia Zhonglian Yaxin Green Intelligent Computing Centre (内蒙古中联亚信绿色智算中心项目). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as at the land and permitting stage on 1 July 2025.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 17 September 2026, and last checked the record on 19 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Named a zero-carbon AI computing (零碳智算) park and permitted for 16kW cabinets. No AI tenant is named.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Zhongwei · All projects in China · All Zhonglian Data Group projects · All projects at the land and permitting stage · Full directory