Also listed as 中交智数谷(宁夏·中卫)产业园.
CCCC Smart Data Valley, Zhongwei is a data center project in Zhongwei, China, operated by CCCC Smart Data Valley (China Communications Construction Group). It is operational. It is planned for 140 MW of IT load.
Latest change on record: entered the record as operational on 17 November 2025. Record last checked against its sources on 18 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and CCCC Smart Data Valley, Zhongwei ranks 6th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.
It is the only China Communications Construction Group project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1 is operational with a 2025 target; Full park at 140 MW is announced. The stage was recorded as operational on 17 November 2025. The money on record is CN¥3.8bn as of November 2025, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 20 May 2026, and last checked the record on 18 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
A 140MW IT greenfield park opened in 2025 for computing services.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Zhongwei · All projects in China · All projects operational · Full directory