ArusGridProject
Directory › China › Zhongwei › China Broadcast Network Ningxia Zhongwei Data Center

China Broadcast Network Ningxia Zhongwei Data Center

Zhongwei, Ningxia, China · Zhongwei market · location approximate to city level

Also listed as 中国广电宁夏中卫数据中心.

China Broadcast Network Ningxia Zhongwei Data Center is a data center project in Zhongwei, China, operated by China Broadcast Network Ningxia (中国广电宁夏网络有限公司). It is operational and expanding. The operator has not published an IT load figure. It is planned for 12,096 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as expanding on 21 August 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Broadcast Network Ningxia (中国广电宁夏网络有限公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and China Broadcast Network Ningxia Zhongwei Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

It is the only China Broadcast Network project ArusGrid tracks. It sits on the Western Cloud Base (西部云基地) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 (halls A1 and A2) is operational with a 2024 target; Phase 2 is under construction. The stage was recorded as operational and expanding on 21 August 2024. The money on record is CN¥10bn as of July 2024, the announced investment. Power comes from 大唐中卫 110kV 开关站 No.1 and No.2 through a dedicated substation at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 9 public sources for this project, the latest dated 12 June 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

DVBCN (31 Jul 2024) says the phase 1 halls can host an AI computing centre with 10 to 14kW servers. No AI tenant is confirmed.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 (halls A1 and A2) · OperationalSize not published, target 2024
Phase 2 · Under constructionSize not published

Stage history

2024-08-21Expanding · nxzw.gov.cn

Who is behind it

OperatorChina Broadcast Network Ningxia (中国广电宁夏网络有限公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-07CN¥10bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land seller中卫市人民政府 (land approval 卫政土批字〔2022〕20号) · 140,302 sqm · leasehold · May 2025 Confirmed source ↗
140,302 sqm (210.45 mu as stated), industrial land acquired by grant (出让). Term and price not stated. Plan: 8 data centre buildings, 2 general buildings, 1 power building, 7 power centres, about 123,345 sqm.
Power supply
Dedicated substation大唐中卫 110kV 开关站 No.1 and No.2 · 252 MVA · 110kV · Nov 2025 Confirmed source ↗
builder 中国广电宁夏网络有限公司; EIA compiled Oct 2025

Sources checked 2026-10-19

  1. 中国广电宁夏中卫数据中心点亮运营暨二期奠基活动在卫举行 (中卫市人民政府, 2024-08-22)
  2. 中国广电宁夏中卫数据中心项目一期主体全面封顶 (中卫市云计算和大数据发展局, 2023-08-08)
  3. 助力打造广电数据中心!中国广电宁夏公司与深圳数巫智算签约 (DVBCN, 2024-07-31)
  4. 建设项目环境影响报告表(生态影响类)(报批稿) 项目名称:中国广电(宁夏·中卫)数据中心续建项目 110kV 输变电工程项目 (中卫市生态环境局, 2025-11-03)
  5. 中国广电(宁夏·中卫)数据中心项目建设用地规划许可证证后公示 (中卫市自然资源局, 2025-05-26)
  6. 中国广电(宁夏·中卫)数据中心续建项目(C2 综合楼、A3 数据中心楼)建设工程规划许可证证后公示 (中卫市自然资源局, 2024-09-30)
  7. 中国广电(宁夏·中卫)数据中心续建项目(A4数据中心楼)建设工程规划许可证证后公示 (中卫市自然资源局, 2025-10-29)
  8. 中国广电(宁夏·中卫)数据中心续建项目110kV输变电工程项目建设工程规划许可证证后公示 (中卫市自然资源局, 2025-11-28)
  9. Cummins and Distributors to Build Standby Power Solution for Data Centers in China (Rental Equipment Register (rermag.com), 2026-06-12)

More in Zhongwei

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.