Also listed as 中国移动(宁夏中卫)数据中心A园区.
China Mobile Zhongwei Data Center, Park A is a data center project in Zhongwei, China, operated by China Mobile Ningxia (中国移动通信集团宁夏有限公司). It is operational. The operator has not published an IT load figure. It is planned for 55,000 racks, with 48,000 in service. ArusGrid does not convert racks into MW.
Latest change on record: moved to operational on 21 May 2025. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and China Mobile Zhongwei Data Center, Park A has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.
China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the China Mobile Zhongwei Data Center campus alongside China Mobile Zhongwei Data Center, Park B and China Mobile Zhongwei Data Center, Xuanhe Park. Named users of the compute are Meituan, Alibaba, Tencent, Meituan, Alibaba Cloud and Tencent (reported, unconfirmed).
The build is phased. Phase 1 (A park) is operational with a 2024 target; Phase 2 is under construction with a 2025 target. The dated record runs from under construction in 2015 to operational on 21 May 2025. The money on record is CN¥4bn as of May 2025, the announced investment. Cooling uses hybrid air and liquid cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 5 June 2026, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
China Mobile says phase 2 is planned at over 80% AI computing (科技日报, 21 May 2025).
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
as of 2025-05-21
科技日报 names Meituan among tenants of the China Mobile Zhongwei centre.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
as of 2025-05-21
科技日报 names Alibaba among tenants of the China Mobile Zhongwei centre.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
as of 2025-05-21
科技日报 names Tencent among tenants of the China Mobile Zhongwei centre.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
as of 2025-05-21
Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
as of 2025-05-21
Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
as of 2025-05-21
Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.
Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
The figure covers the whole campus.
No colocation price applies to this product (retail interconnection, no colocation price applies).
All projects in Zhongwei · All projects in China · All China Mobile projects · All projects operational · Full directory