China Mobile Zhongwei Data Center, Park A

Zhongwei, Ningxia, China · Zhongwei market · location approximate to city level

Also listed as 中国移动(宁夏中卫)数据中心A园区.

China Mobile Zhongwei Data Center, Park A is a data center project in Zhongwei, China, operated by China Mobile Ningxia (中国移动通信集团宁夏有限公司). It is operational. The operator has not published an IT load figure. It is planned for 55,000 racks, with 48,000 in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational on 21 May 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Ningxia (中国移动通信集团宁夏有限公司)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and China Mobile Zhongwei Data Center, Park A has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the China Mobile Zhongwei Data Center campus alongside China Mobile Zhongwei Data Center, Park B and China Mobile Zhongwei Data Center, Xuanhe Park. Named users of the compute are Meituan, Alibaba, Tencent, Meituan, Alibaba Cloud and Tencent (reported, unconfirmed).

The build is phased. Phase 1 (A park) is operational with a 2024 target; Phase 2 is under construction with a 2025 target. The dated record runs from under construction in 2015 to operational on 21 May 2025. The money on record is CN¥4bn as of May 2025, the announced investment. Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 4 public sources for this project, the latest dated 5 June 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

China Mobile says phase 2 is planned at over 80% AI computing (科技日报, 21 May 2025).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 (A park) · OperationalSize not published, target 2024
Phase 2 · Under constructionSize not published, target 2025

Stage history

2015Under construction · stdaily.com
2025-05-21Operational · stdaily.com

Who is behind it

OperatorChina Mobile Ningxia (中国移动通信集团宁夏有限公司) · Telco

Who uses the compute

Tenant · enterpriseMeituan · reported, unconfirmed

as of 2025-05-21

科技日报 names Meituan among tenants of the China Mobile Zhongwei centre.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Tenant · hyperscalerAlibaba · reported, unconfirmed

as of 2025-05-21

科技日报 names Alibaba among tenants of the China Mobile Zhongwei centre.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Tenant · hyperscalerTencent · reported, unconfirmed

as of 2025-05-21

科技日报 names Tencent among tenants of the China Mobile Zhongwei centre.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Tenant · enterpriseMeituan · reported, unconfirmed

as of 2025-05-21

Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Tenant · hyperscalerAlibaba Cloud · reported, unconfirmed

as of 2025-05-21

Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Tenant · hyperscalerTencent · reported, unconfirmed

as of 2025-05-21

Science and Technology Daily says the China Mobile Zhongwei DC phase 1 serves Meituan, Alibaba and Tencent. Mapped to Park A as the operational phase 1 site.

Source · 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)

Money at this site

Announced investment, 2025-05CN¥4bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Building A01 ran a water-cooling trial in 2018; building A05 then used air cooling. Later Park B uses a dual-source glycol/refrigerant system.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedXiangjiang Systems Engineering (香江系统工程有限公司) · Mechanical and electrical works · CNY 1,125.85m (≈US$158m) · Mar 2026 source ↗
This project is one of 2 that fit. The other is China Mobile Zhongwei Data Center, Park B.

Sources checked 2026-10-19

  1. 全国首个大规模“源网荷储”一体化数据中心园区全面投用 (中国日报网, 2026-06-05)
  2. 宁夏首个大型绿色数据中心年底再升级 (科技日报, 2025-05-21)
  3. 一张蓝图绘十年 中卫铸就算力网络全国性枢纽 (证券时报, 2025-03-25)
  4. 宁夏中卫数字信息产业开发区发展规划(2026—2035年)(征求意见稿) (中卫市人民政府, 2025-12-19)

Same campus, China Mobile Zhongwei Data Center

More in Zhongwei

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.