China Mobile YRD (Wuhu) Data Centre (中国移动长三角(芜湖)数据中心)

Wuhu, Anhui, China · Wuhu market · location approximate to district level

China Mobile YRD (Wuhu) Data Centre (中国移动长三角(芜湖)数据中心) is a data center project in Wuhu, China, operated by China Mobile Anhui (中国移动安徽公司). It is under construction. The operator has not published an IT load figure. It is planned for 7,815 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as under construction on 17 October 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Mobile Anhui (中国移动安徽公司)
Telco
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Wuhu holds 6 active projects with 298 MW of planned IT load between them, and China Mobile YRD (Wuhu) Data Centre (中国移动长三角(芜湖)数据中心) has no published figure so it sits outside that ranking. Of those, 2 are operational and expanding, 3 are under construction and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Wuhu, and ArusGrid does not estimate one.

China Mobile has 11 others in China tracked by ArusGrid, including China Mobile Zhongwei Data Center, Park B, China Mobile (Gansu Qingyang) Data Center and China Mobile Hohhot Data Center. It sits on the Jiangbei New Area industrial concentration zone (江北新区产业集中区) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 17 October 2024. The money on record is CN¥6bn as of October 2024, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 19 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Planned for 22 EFLOPS of compute with 1,278 AI racks at 40kW each (Oct 2024).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

3 Grade A data centre buildings, 1,278 AI racks at 40kW and 6,537 general racks at 7kW · Under constructionSize not published

Stage history

2024-10-17Under construction · ah.people.com.cn

Who is behind it

OperatorChina Mobile Anhui (中国移动安徽公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-10CN¥6bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Project team
Mechanical and electrical works易事特 (East Group) · Mar 2026 Reported source ↗
Supply of in-house UPS power systems
Land
Site64,327 sqm · May 2024 Confirmed source ↗
Site bounded by Wuyue Rd (E), Yinpingshan Rd (S), Wanlian Rd (W), Chang'an Ave (N). Above-ground GFA about 87,535 sqm plus 3,935 sqm underground. Counterparty not disclosed.
Power supply
Dedicated substation110kV · May 2025 Confirmed source ↗
Build includes 3 data halls, 3 power centres and 1 substation building. The 110kV substation was assessed under a separate EIA.
Water and cooling
CoolingWater-cooled chillers Inferred by ArusGrid source ↗
EIA notes cooling-tower blowdown discharged directly to the sewer network, which implies cooling towers on a water-cooled plant.
Why we think so. Cooling type inferred from cooling-tower blowdown in the EIA notice.

Sources checked 2026-10-19

  1. 中国移动长三角(芜湖)数据中心项目开工 赋能数字经济助力芜湖算力产业高质量发展 (人民网安徽频道, 2024-10-17)
  2. 算力尽头是电力!易事特UPS服务中国移动芜湖智算中心,硬核赋能国家算力枢纽 (中华网 (看点时报), 2026-03-20)
  3. 省重点项目清单公布,芜湖+58! (新京报, 2026-09-19)
  4. 中国移动长三角(芜湖)数据中心项目方案设计批前公示 (皖江江北新兴产业集中区管委会, 2024-05-20)
  5. 关于中国移动通信集团有限公司安徽分公司中国移动长三角(芜湖)数据中心项目环境影响报告表批前公示 (芜湖市生态环境局, 2025-05-16)
  6. 关于退回中国移动通信集团有限公司安徽分公司中国移动长三角(芜湖)第二数据中心项目环境影响报告表的函 (Wuhu Ecology and Environment Bureau, 2026-08-21)

More in Wuhu

Also run by China Mobile

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.