Wuhu Longteng Intelligent Computing Internet Industrial Park (芜湖珑腾智算互联网产业园)

Sanshan Economic Development Zone, Wuhu, Anhui, China · Wuhu market · location approximate to district level

Also listed as 世纪珑腾芜湖 and 世纪华通芜湖数据中心.

Wuhu Longteng Intelligent Computing Internet Industrial Park (芜湖珑腾智算互联网产业园) is a data center project in Sanshan Economic Development Zone, Wuhu, China, operated by Shanghai Century Longteng Data Technology (上海世纪珑腾数据科技), via Wuhu Century Longteng Data Services. It is under construction. It is planned for 298 MW of IT load.

Latest change on record: moved to under construction on 7 January 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
298 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Shanghai Century Longteng Data Technology (上海世纪珑腾数据科技), via Wuhu Century Longteng Data Services
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Wuhu holds 6 active projects with 298 MW of planned IT load between them, and Wuhu Longteng Intelligent Computing Internet Industrial Park (芜湖珑腾智算互联网产业园) ranks first by planned capacity. Of those, 2 are operational and expanding, 3 are under construction and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Wuhu, and ArusGrid does not estimate one.

It is the only Century Huatong project ArusGrid tracks. It sits on the Century Longteng Wuhu campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from announced only on 11 November 2022 to under construction on 7 January 2025. The money on record is CN¥8.2bn as of November 2022, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 3 public sources for this project, the latest dated 3 December 2025, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Branded an intelligent computing park; the 2022 filing tied phase 1 to an unnamed third-party customer.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

First data centre building · Under constructionSize not published, target 2025

Stage history

2022-11-11Announced · jiemian.com
2025-01-07Under construction · ahchanye.com

Who is behind it

OperatorShanghai Century Longteng Data Technology (上海世纪珑腾数据科技), via Wuhu Century Longteng Data Services · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2022-11CN¥8.2bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Mechanical and electrical works香江系统工程有限公司 (subsidiary of 城地香江 603887) · CNY 1,980,000,000m · Nov 2024 · completed Confirmed source ↗
芜湖珑腾智算互联网产业园一期 data centre electromechanical general contract, client 芜湖世纪珑腾数据服务有限公司; phases 1 and 2 settled at 1,646,484,000 yuan
Water and cooling
Coolingdesign PUE 1.249 Reported source ↗
cooling type not stated

Sources checked 2026-10-19

  1. 世纪华通:拟投建芜湖互联网数据中心项目,计划建设约3万个机架 (界面新闻, 2022-11-11)
  2. 芜湖珑腾智算互联网产业园项目首栋数据中心主体结构封顶 (安徽产业网, 2025-01-07)
  3. 上海城地香江数据科技股份有限公司关于前期已披露重要项目进展的公告 (上海证券报 (中国证券网), 2025-12-03)

More in Wuhu

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.