ArusGridProject
Directory › China › Wuhu › China Unicom YRD (Wuhu) Intelligent Computing Centre (中国联通长三角(芜湖)智算中心)

China Unicom YRD (Wuhu) Intelligent Computing Centre (中国联通长三角(芜湖)智算中心) data center

Wuhu, Anhui, China · Wuhu market · location approximate to district level

China Unicom YRD (Wuhu) Intelligent Computing Centre (中国联通长三角(芜湖)智算中心) is a data center project in Wuhu, China, operated by China Unicom (中国联通). It is operational and expanding. The operator has not published an IT load figure. It is planned for 8,750 racks, with 792 in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to expanding on 10 November 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Unicom (中国联通)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Wuhu holds 6 active projects with 298 MW of planned IT load between them, and China Unicom YRD (Wuhu) Intelligent Computing Centre (中国联通长三角(芜湖)智算中心) has no published figure so it sits outside that ranking. Of those, 2 are operational and expanding, 3 are under construction and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Wuhu, and ArusGrid does not estimate one.

China Unicom has 9 others in China tracked by ArusGrid, including China Unicom Zhongwei Cloud Data Center, China Unicom (Huailai) Big Data Innovation Industrial Park (中国联通(怀来)大数据创新产业园) and China Unicom Southwest Data Center (Chongqing Shuitu). It sits on the Jiangbei New Area (江北新区) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1, 792 racks is operational; Phase 2, two data centre buildings and a 110kV substation is under construction with a 2026 target. The dated record runs from under construction on 24 November 2023 to operational and expanding on 10 November 2025. The money on record is CN¥6bn as of November 2023, the announced investment. Power comes from China Unicom Wuhu branch (owner of substation) through a dedicated substation at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 19 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Planned for 50,000P of compute at full build (Nov 2025).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, 792 racks · OperationalSize not published
Phase 2, two data centre buildings and a 110kV substation · Under constructionSize not published, target 2026

Stage history

2023-11-24Under construction · m.thepaper.cn
2025-11-10Expanding · sjzyj.wuhu.gov.cn

Who is behind it

OperatorChina Unicom (中国联通) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2023-11CN¥6bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Dedicated substationChina Unicom Wuhu branch (owner of substation) · 252 MVA · 110kV · Sep 2025 Confirmed source ↗
New 110kV substation with 4 x 63MVA transformers (2 duty, 2 standby), so firm capacity is 126MVA. Located in the SW corner of the Unicom YRD (Wuhu) Intelligent Computing Centre park, Dalongwan, Jiangbei. · Applies to the whole campus.

Sources checked 2026-10-19

  1. 三大运营商齐发力!芜湖这个集群建设正酣 (澎湃新闻 (大江资讯), 2023-11-30)
  2. 芜湖日报|【这座城 这五年】智算!枢纽! (芜湖市数据资源管理局 (芜湖日报), 2025-11-10)
  3. 用AI联通 | 算力破局 全国布局! (新华网 (人民邮电报), 2025-11-25)
  4. 省重点项目清单公布,芜湖+58! (新京报, 2026-09-19)
  5. 关于中国联合网络通信有限公司芜湖市分公司中国联通长三角(芜湖)智算中心建设项目110千伏变电站工程环境影响报告表审批意见的函 (芜湖市生态环境局, 2025-09-12)
  6. 中国联通长三角(芜湖)智算中心项目封顶 (芜湖市人民政府, 2024-06-03)

More in Wuhu

Also run by China Unicom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.