China Telecom Zhongwei Computing Hub

Zhongwei, Ningxia, China · Zhongwei market · location approximate to city level

Also listed as 中国电信中卫算力枢纽.

China Telecom Zhongwei Computing Hub is a data center project in Zhongwei, China, operated by China Telecom Ningxia (中国电信股份有限公司宁夏分公司). It is operational and expanding. The operator has not published an IT load figure. It is planned for 25,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: entered the record as expanding on 23 June 2026. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom Ningxia (中国电信股份有限公司宁夏分公司)
Telco
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Zhongwei holds 18 active projects with 3,558 MW of planned IT load between them, and China Telecom Zhongwei Computing Hub has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 3 are under construction, 3 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Zhongwei, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as operational and expanding on 23 June 2026. The money on record is CN¥2bn as of December 2025, the announced investment. Power comes from State Grid Ningxia Zhongwei Power Supply Company (国网宁夏电力中卫供电公司) through grid supply at 110 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 11 public sources for this project, the latest dated 4 September 2026, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

A 30,000-card AI computing cluster is running (新华网, 17 Mar 2026).

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2026-06-23Expanding · stdaily.com

Who is behind it

OperatorChina Telecom Ningxia (中国电信股份有限公司宁夏分公司) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-12CN¥2bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Design and build contractor中浙信科技咨询有限公司 · CNY 202.71m · Jan 2026 Reported source ↗
Consortium lead, data centre phase 3 zone C2 (phase 1 civil) lot 3, EPC with 162 calendar-day schedule. Tenderer 中国电信股份有限公司宁夏分公司. Lot investment 207.64m yuan incl. tax.
Design and build contractor中铁十二局集团电气化工程有限公司 · Jan 2026 Reported source ↗
Consortium member with 中浙信科技咨询 for zone C2 (phase 1 civil) lot 3. Consortium price 202.71m yuan.
Land
Land seller中卫市人民政府 (land approval 卫政土批字〔2025〕12号) · 53,707 sqm · leasehold · Jun 2025 Confirmed source ↗
Phase 3 zone C1 plot, 53,707 sqm (80.56 mu as stated), industrial land for cloud computing and big data centre, acquired by grant (出让). Term and price not stated.
Power supply
Grid supplyState Grid Ningxia Zhongwei Power Supply Company (国网宁夏电力中卫供电公司) · 110kV · Sep 2026 Confirmed source ↗
110kV user connection from the 凤云 and 雅云 110kV switching stations to a new China Telecom T2 110kV substation. EIA accepted 4 Sep 2026. · Applies to the whole campus.

Sources checked 2026-10-18

  1. 宁夏中卫:算力产业从“干沙滩”到“智沙滩” (科技日报, 2026-06-23)
  2. 因地制宜发展新质生产力丨打造“绿色算力之都”,宁夏中卫靠什么? (新华网, 2026-03-17)
  3. 宁夏中卫数字信息产业开发区发展规划(2026—2035年)(征求意见稿) (中卫市人民政府, 2025-12-17)
  4. 宁夏中卫电信数据中心三期110千伏用户接入工程 (中卫市生态环境局, 2026-09-04)
  5. 中国电信宁夏省级数据中心三期建设项目建设工程规划许可证证后公示 (中卫市自然资源局, 2026-02-13)
  6. 中国电信宁夏公司中卫一体化枢纽节点数据中心三期C1区建设项目(C1机房楼、1#门卫、2#门卫、C1柴发平台)建设工程规划许可证证后公示 (中卫市自然资源局, 2026-01-08)
  7. 2026年自治区重点建设项目清单 (宁夏回族自治区发展和改革委员会, 2026-01-06)
  8. 看西北寒地如何成为“零碳算力”热土 (新华网 (经济参考报), 2026-02-09)
  9. 中国电信宁夏公司中卫一体化枢纽节点数据中心三期C2区建设项目(一期土建)标段3 中标结果公示 (搜狐号 (repost of result notice), 2026-01-13)
  10. 中国电信宁夏公司中卫一体化枢纽节点数据中心三期C1区建设项目建设用地 规划许可证证后公示 (中卫市自然资源局, 2025-06-26)
  11. 中国电信宁夏公司中卫一体化枢纽节点C1区T2-110KV变电站建设工程项目建设工程规划许可证证后公示 (中卫市自然资源局, 2026-04-17)

More in Zhongwei

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.