China Telecom Cloud Computing Guizhou Information Park

Gui'an, Guizhou, China · Gui'an market · location approximate to city level

Also listed as 中国电信云计算贵州信息园, China Telecom Gui'an data center, 东数西算(贵州)智算中心 and 中国电信贵安数据中心.

China Telecom Cloud Computing Guizhou Information Park is a data center project in Gui'an, China, operated by China Telecom (中国电信). It is operational and expanding. The operator has not published an IT load figure. It reports 14,000 racks in service. ArusGrid does not convert racks into MW.

Latest change on record: moved to expanding on 13 November 2025. Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom (中国电信)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and China Telecom Cloud Computing Guizhou Information Park has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the China Telecom Guizhou Information Park. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Buildings in service (15) is operational with a 2015 target; Two further buildings, about 5,000 racks is under construction with a 2026 target. The dated record runs from under construction on 21 October 2013 to operational and expanding on 13 November 2025. The money on record is CN¥7bn as of December 2013, the announced investment. Power comes from China Southern Power Grid through grid supply. Cooling uses air cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 8 public sources for this project, the latest dated 30 August 2026, and last checked the record on 17 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

The park hosts the Gui'an Supercomputing Center and China Telecom's East Data West Computing (Guizhou) intelligent computing centre core node, per Xinhua and Science and Technology Daily (Aug 2026). No dated GPU count was found.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Buildings in service (15) · OperationalSize not published, target 2015
Two further buildings, about 5,000 racks · Under constructionSize not published, target 2026

Stage history

2013-10-21Under construction · yicai.com
2025-11-13Expanding · wb.gywb.cn

Who is behind it

OperatorChina Telecom (中国电信) · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2013-12CN¥7bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Site333,350 sqm · Dec 2013 Reported source ↗
Total site area 500 mu converted at 666.7 sqm/mu. Counterparty not disclosed.
Power supply
Grid supplyChina Southern Power Grid · Aug 2015 Confirmed source ↗
Two utility feeds come directly from China Southern Power Grid. Backup is six large diesel generators with two 30-tonne fuel tanks. Switchover takes 40 seconds and backup runs up to 8 hours. · Applies to the whole campus.
Water and cooling
CoolingAir cooled Reported source ↗
Airflow optimisation and use of fresh air (新风) for cooling.

Sources checked 2026-10-17

  1. 中国移动中国联通 贵州开建云计算中心 (Yicai, 2013-12-17)
  2. 贵安新区2家入选!国家新型数据中心典型案例名单出炉 (Sina, 2022-02-11)
  3. 贵州算力 | 贵安新区:“算”出蓬勃生产力 (贵州日报 via China Daily, 2025-06-17)
  4. 数智融实业 服务惠民生 "算"出吸引力 聚"链"焕新机 (贵阳日报, 2025-08-28)
  5. 贵安三个数据中心入选'2025年度国家绿色数据中心'名单 (贵阳晚报, 2025-11-13)
  6. 算力向西,贵州炼成中国算力高地 (科技日报, 2026-08-26)
  7. 从存储到智算,贵州靠什么? (人民日报, 2026-08-30)
  8. 中国电信云计算“南核”不牛?习大大都来 (天翼云 (China Telecom), 2015-08-06)

More in Gui'an

Also run by China Telecom

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.