China Telecom Cloud Computing Guizhou Information Park is a data center project in Gui'an, China, operated by China Telecom (中国电信). It is operational and expanding. The operator has not published an IT load figure. It reports 14,000 racks in service. ArusGrid does not convert racks into MW.
Latest change on record: moved to expanding on 13 November 2025. Record last checked against its sources on 17 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Gui'an holds 12 active projects with 90 MW of planned IT load between them, and China Telecom Cloud Computing Guizhou Information Park has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.
China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the China Telecom Guizhou Information Park. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Buildings in service (15) is operational with a 2015 target; Two further buildings, about 5,000 racks is under construction with a 2026 target. The dated record runs from under construction on 21 October 2013 to operational and expanding on 13 November 2025. The money on record is CN¥7bn as of December 2013, the announced investment. Power comes from China Southern Power Grid through grid supply. Cooling uses air cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 8 public sources for this project, the latest dated 30 August 2026, and last checked the record on 17 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
The park hosts the Gui'an Supercomputing Center and China Telecom's East Data West Computing (Guizhou) intelligent computing centre core node, per Xinhua and Science and Technology Daily (Aug 2026). No dated GPU count was found.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.