Directory › China › Gui'an › China Construction Bank Gui'an New Area Data Center
China Construction Bank Gui'an New Area Data Center
Gui'an, Guizhou, China · Gui'an market · location approximate to city level
Also listed as 中国建设银行贵州贵安新区数据中心及大数据应用示范基地项目, 建行贵安数据中心 and CCB Gui'an data center.
China Construction Bank Gui'an New Area Data Center is a data center project in Gui'an, China, operated by China Construction Bank (中国建设银行). It is under construction. The operator has not published an IT load figure. It is planned for 30,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as under construction on 13 January 2025. Record last checked against its sources on 19 October 2026.
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed✓ Tenant or own use○ Builder appointed✓ Construction started
Next gate to watch: Money committed.
Your call. Will it be built?
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Gui'an holds 12 active projects with 90 MW of planned IT load between them, and China Construction Bank Gui'an New Area Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.
It is the only China Construction Bank project ArusGrid tracks. The named user of the compute is China Construction Bank (confirmed).
The stage was recorded as under construction on 13 January 2025. The money on record is CN¥11.3bn as of August 2025, the announced investment. Power comes from 中国建设银行股份有限公司贵州省分行 (self-built substations) through a dedicated substation at 220 kV.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 14 August 2025, and last checked the record on 19 October 2026.
How well evidenced is it
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusUnlikely
This is a bank's own-use enterprise data centre and no AI purpose is stated.
Access to AI chips
GradeLicence required for a party
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Phases
Phase 1 (ME-01-01 plot) · Under constructionSize not published
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
Project team
Construction supervisor上海建科工程咨询有限公司 · CNY 10.98m · Nov 2024 Reportedsource ↗
Construction supervision, ME-01-01 plot phase 1.
Main contractor中国建筑第四工程局有限公司 · Nov 2024 · bid submitted, result pending Reportedsource ↗
Ranked first and recommended winner (score 72.53) for 施工总承包 of ME-01-01 plot phase 1, per the evaluation publicity. A contract-publicity notice title exists but its text could not be read, so this is held as bid_pending.
Fit-out contractor中邮建技术有限公司 · CNY 1,780.41m · Jun 2025 · bid submitted, result pending Reportedsource ↗
First bid candidate for 机房工艺安装工程和智能化系统集成设计与施工 (phase 1: 4 data halls, 2 generator buildings, 2 substations etc.). Budget CNY 2.246bn.
Acquired by 中国建设银行股份有限公司贵州省分行 through public transfer (公开出让); planning permit date 2023-07-20; Class-1 industrial use. The selling authority is not named. Area 317,700 sqm is the total project site from the 2025-06-24 tender summary (https://www.sohu.com/a/907293466_121502789: '总用地面积31.77万平方米'), not from this EIA. Price not disclosed.
Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.