Directory › China › Gui'an › Apple iCloud (Gui'an) Data Center

Apple iCloud (Gui'an) Data Center

Gui'an, Guizhou, China · Gui'an market · location approximate to city level

Also listed as 苹果iCloud(贵安)数据中心, Apple Gui'an data center and 苹果中国(贵安)数据中心.

Apple iCloud (Gui'an) Data Center is a data center project in Gui'an, China, operated by Guizhou-Cloud Big Data (云上贵州大数据产业发展有限公司). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to operational on 25 May 2021. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Guizhou-Cloud Big Data (云上贵州大数据产业发展有限公司)
Local developer
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and Apple iCloud (Gui'an) Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

It is the only GCBD project ArusGrid tracks. Named funding comes from Apple. The named user of the compute is Apple (confirmed).

The dated record runs from under construction on 25 May 2018 to operational on 25 May 2021. The money on record is US$1bn as of January 2018, the announced investment.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 5 public sources for this project, the latest dated 28 May 2021, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Stage history

2018-05-25Under construction · news.mydrivers.com
2020-04-02Under construction · cac.gov.cn
2021-05-25Operational · pingwest.com

Who is behind it

OperatorGuizhou-Cloud Big Data (云上贵州大数据产业发展有限公司) · Local developer
Funder, Joint venture partnerApple

Who uses the compute

Tenant · hyperscalerApple · confirmed

as of 2021-05-28

Guizhou Daily, as cited by PingWest, reports the centre was jointly built by Yunshang Guizhou and Apple and entered operation on 25 May 2021. It holds iCloud data for users in mainland China.

Source · 苹果 iCloud(贵安)数据中心建成并投入运行 (PingWest, 2021-05-28)

Money at this site

Announced investment, 2018-01US$1bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.

Land
Site666,670 sqm · Jan 2018 Reported source ↗
Reported as about 1,000 mu for a two-phase site. Converted at 1 mu = 666.67 sqm. Site selection was done but construction had not started as of Jan 2018.
Power supply
Power allocation or planJul 2017 Reported source ↗
Planned to run on 100% renewable clean energy, in line with Apple's other data centres. · Design intent at announcement. The supply mechanism was not stated.

Sources checked 2026-10-19

  1. 苹果云飘落贵州幕后:两年艰难谈判争论排他条款,苹果妥协 (The Paper, 2018-01-17)
  2. “新基建”使贵州大数据产业迎来发展新机遇 (经济参考报 via cac.gov.cn, 2020-04-02)
  3. 苹果 iCloud(贵安)数据中心建成并投入运行 (PingWest, 2021-05-28)
  4. 苹果中国第一个数据中心,为什么选在贵州? (钛媒体 via 凤凰网, 2017-07-13)
  5. 苹果中国贵安数据中心正式通电:iCloud体验将大幅改善 (快科技, 2019-12-11)

More in Gui'an

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.