Huawei Cloud Gui'an Data Center is a data center project in Gui'an, China, operated by Huawei Cloud (华为云计算技术有限公司). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to expanding on 13 January 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Huawei Cloud (华为云计算技术有限公司)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Gui'an holds 12 active projects with 90 MW of planned IT load between them, and Huawei Cloud Gui'an Data Center has no published figure so it sits outside that ranking. Of those, 5 are operational, 4 are operational and expanding and 3 are under construction. No third party publishes a colocation vacancy rate for Gui'an, and ArusGrid does not estimate one.

Huawei has 3 others in China tracked by ArusGrid, including Huawei Cloud North China (Horinger) Data Center, Huawei Cloud Ulanqab Data Center and Huawei Cloud East China (Wuhu) Data Centre (华为云华东(芜湖)数据中心). It sits on the Huawei Cloud Gui'an campus. The named user of the compute is Huawei Cloud (confirmed).

The build is phased. Phase 1 is operational with a 2021 target; Zone D1 is under construction; Huawei Cloud Machang data center / intelligent computing base is under construction. The dated record runs from under construction on 3 August 2017 to operational and expanding on 13 January 2025. Power comes from 华为云计算技术有限公司 (substation owner) through a dedicated substation at 220 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 10 public sources for this project, the latest dated 18 March 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Xinhua (18 Mar 2026) says the centre supports national AI large-model training. Daily Economic News (25 Aug 2026) says its Gui'an AI factory hosts 13 AI companies. Huawei Cloud signed an agreement on 30 Mar 2024 to build an intelligent computing base in Gui'an.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1 · OperationalSize not published, target 2021
Zone D1 · Under constructionSize not published
Huawei Cloud Machang data center / intelligent computing base · Under constructionSize not published

Stage history

2017-08-03Under construction · datacenterdynamics.com
2021-09-09Operational · yicai.com
2025-01-13Expanding · rb.gywb.cn

Who is behind it

OperatorHuawei Cloud (华为云计算技术有限公司) · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerHuawei Cloud · confirmed

as of 2021-09-09

Huawei Cloud self-build. Yicai calls it Huawei Cloud's largest data centre worldwide.

Source · 华为在贵安建了个"童话小镇":里面藏着它最重要的数据资产 (Yicai, 2021-09-09)

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Power supply
Dedicated substation华为云计算技术有限公司 (substation owner) · 300 MVA · 220kV · May 2024 Confirmed source ↗
220/10.5kV substation serving the 贵安华为云数据中心高端园A4地块. Near-term 3x100MVA (300 MVA); ultimate 8x100MVA (800 MVA). Approved 2023-12-08. · Applies to the whole campus.
Dedicated substation华为云计算技术有限公司 (substation owner) · 300 MVA · 220kV · Mar 2025 Confirmed source ↗
Second 220/10.5kV substation, serving 贵安华为云数据中心 AZ3 马场区域一期项目 at plot MA-04-01. Near-term 3x100MVA; ultimate 8x100MVA. Core approval 2025-02-28. · Applies to the whole campus.
Water and cooling
Cooling Reported source ↗
Cooling method not stated. PUE of 1.12 was stated at the opening on 20 Dec 2021, a reported operating figure, not a design figure.

Sources checked 2026-10-19

  1. Huawei breaks ground on Guizhou data center (DCD, 2017-08-03)
  2. “新基建”使贵州大数据产业迎来发展新机遇 (经济参考报 via cac.gov.cn, 2020-04-02)
  3. 华为在贵安建了个"童话小镇":里面藏着它最重要的数据资产 (Yicai, 2021-09-09)
  4. "中国数谷"算启未来 (China Daily (Chinese), 2023-08-08)
  5. 华为云将在贵安新区建设智算中心;临港首辆“网联化”公交上路;奇瑞风云A8远航版正式上市|Do早报 (DoNews, 2024-03-31)
  6. 夯实算力底座 打造面向全国的算力保障基地 (贵阳日报, 2025-01-13)
  7. 从“抢先机”到“抢新机”,再到“做强做优”——贵州:耕“云”种“数”迈出“第三步” (新华每日电讯, 2026-03-18)
  8. 建设项目环境影响报告表(报批稿)贵安华为云数据中心高端园 A4 地块 220kV 变电站工程 (贵州省生态环境厅, 2024-05-15)
  9. 贵安华为云数据中心 AZ3 马场区域一期项目 220kV 变电站工程环境影响评价报告表 (贵州省生态环境厅, 2025-03-21)
  10. Huawei opens data center in Guian New Area (eGuizhou, 2021-12-22)

More in Gui'an

Also run by Huawei

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.