ArusGridProject
Directory › China › Shaoguan › Yingshuo Huanan Shugu (South China Data Valley) Intelligent Computing Centre

Yingshuo Huanan Shugu (South China Data Valley) Intelligent Computing Centre data center

Shaoguan, Guangdong, China · Shaoguan market · location approximate to district level

Yingshuo Huanan Shugu (South China Data Valley) Intelligent Computing Centre is a data center project in Shaoguan, China, operated by Yingshuo Group with China Electronics (鹰硕集团, 中国电子). It is operational. The operator has not published an IT load figure. It is planned for 30,000 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to operational on 11 March 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Yingshuo Group with China Electronics (鹰硕集团, 中国电子)
Local developer
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Shaoguan holds 11 active projects with 200 MW of planned IT load between them, and Yingshuo Huanan Shugu (South China Data Valley) Intelligent Computing Centre has no published figure so it sits outside that ranking. Of those, 4 are operational, 1 is operational and expanding, 3 are under construction, 1 is being commissioned and 2 are announced only. No third party publishes a colocation vacancy rate for Shaoguan, and ArusGrid does not estimate one.

It is the only Yingshuo Group project ArusGrid tracks. It sits on the 中电鹰硕华南数谷大数据中心 campus. The named user of the compute is 韶关市 government and public-sector systems (政务、安监、教育、医疗、环保) (reported, unconfirmed).

The dated record runs from under construction in March 2020 to operational on 11 March 2024. The money on record is CN¥2.36bn as of April 2024, the announced investment. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.25.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 13 June 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Described as an intelligent computing centre with a 16,000P heterogeneous compute pool target for phase 1.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase 1, three data centre buildings · OperationalSize not published, target 2024

Stage history

2020-03Under construction · m.thepaper.cn
2024-03-11Operational · sznews.com

Who is behind it

OperatorYingshuo Group with China Electronics (鹰硕集团, 中国电子) · Local developer

Who uses the compute

Tenant · government韶关市 government and public-sector systems (政务、安监、教育、医疗、环保) · reported, unconfirmed

as of 2024-03-13

centre will carry Shaoguan smart-city workloads in government, safety, industry, education, healthcare and environment

Source · 总投资23.6亿元!华南数谷智算中心投入运营 (南方日报 (南方网), 2024-03-13)

Money at this site

Announced investment, 2024-04CN¥2.36bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
CoolingHybrid air and liquid cooling · design PUE 1.248 Confirmed source ↗
Chillers, cooling towers and precision air conditioning plus a liquid-cooling system with a liquid-cooling heat-exchange room.

Sources checked 2026-10-19

  1. 广东未来的算力之城,在韶关 (澎湃新闻, 2023-05-28)
  2. ‘百千万工程’的深圳力量”主题采访走进韶关 深企为韶关“输活水”“增算力”“擦招牌” (深圳商报, 2024-04-03)
  3. 第五届粤港澳大湾区(广东)算力产业大会在韶关举行 (科技日报, 2026-06-13)
  4. 广东省能源局关于华南数谷(一期)(II)节能报告的审查意见 (广东省能源局, 2025-01-17)
  5. 广东省能源局关于华南数谷(一期)(II)节能报告的审查意见 (Guangdong Provincial Energy Administration, 2025-01-17)
  6. 总投资23.6亿元!华南数谷智算中心投入运营 (南方日报 (南方网), 2024-03-13)

More in Shaoguan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.