GDS Shaoguan Computing Cluster (万国数据韶关数据中心) data center

Baitu Town start-up zone, Qujiang District, Shaoguan, Guangdong, China · Shaoguan market · location approximate to district level

Also listed as 韶关-万国算力集群 and GDS Shaoguan.

GDS Shaoguan Computing Cluster (万国数据韶关数据中心) is a data center project in Baitu Town start-up zone, Qujiang District, Shaoguan, China, operated by Shaoguan GDS Yunyao Data Technology (韶关万国云耀数据科技). It is being commissioned. The operator has not published an IT load figure. It is planned for 19,200 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to commissioning in September 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Commissioning
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Shaoguan GDS Yunyao Data Technology (韶关万国云耀数据科技)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Shaoguan holds 11 active projects with 200 MW of planned IT load between them, and GDS Shaoguan Computing Cluster (万国数据韶关数据中心) has no published figure so it sits outside that ranking. Of those, 4 are operational, 1 is operational and expanding, 3 are under construction, 1 is being commissioned and 2 are announced only. No third party publishes a colocation vacancy rate for Shaoguan, and ArusGrid does not estimate one.

It is the only GDS Holdings project ArusGrid tracks. It sits on the GDS Shaoguan campus. The named user of the compute is Tencent (reported, unconfirmed).

The dated record runs from announced only on 29 May 2022 to being commissioned in September 2026. The money on record is CN¥1.85bn as of March 2026, a government approval ceiling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 9 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Reported Tencent computing project; GDS was named as planning 10,000-accelerator clusters in Shaoguan in 2026.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Phase II · Under constructionSize not published, target 2028

Stage history

2022-05-29Announced · gds-services.com
2026-03-17Land and permitting · www-web.itiger.com
2026-06-12Under construction · stdaily.com
2026-09Commissioning · 21jingji.com

Who is behind it

OperatorShaoguan GDS Yunyao Data Technology (韶关万国云耀数据科技) · Colocation

Who uses the compute

Tenant · hyperscalerTencent · reported, unconfirmed

as of 2026-09-09

The Shaoguan draft plan, as summarised by Cailian Press, says GDS and China Unicom signed a 250MW Tencent computing project; the split between the two is not stated.

Source · 广东韶关:扩大算力基础设施规模 推动联通与腾讯尽快签约确定新增50MW算力规模 (财联社 (Cailian Press), 2026-09-09)

Money at this site

Approved by a government investment agency, 2026-03CN¥1.85bn

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. GDS Holdings Secures Approval for 1.85 Billion Yuan Shaoguan Computing Cluster Phase II (Deep News (via Tiger Brokers), 2026-03-19)
  2. 广东韶关:扩大算力基础设施规模 推动联通与腾讯尽快签约确定新增50MW算力规模 (财联社 (Cailian Press), 2026-09-09)
  3. 第五届粤港澳大湾区(广东)算力产业大会在韶关举行 (科技日报 (Science and Technology Daily), 2026-06-13)
  4. AI的风吹向粤北,大湾区唯一集群如何“织网”|“逐鹿算网”实地调研韶关篇 (财联社 (Cailian Press), 2026-08-03)
  5. 广东省能源局关于全国一体化算力网络粤港澳大湾区国家枢纽节点韶关•万国数据算力集群项目节能报告的审查意见 (广东省发展和改革委员会, 2022-12-30)
  6. 算力新城崛起!韶关曲江打造产业集聚新高地 (21经济网 (羊城派), 2026-09-06)
  7. 首批签约企业之一!万国数据与韶关市政府达成战略合作,共筑大湾区核心算力枢纽 (万国数据 (GDS), 2022-05-31)

More in Shaoguan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.