Projects being commissioned are built and in testing before the first customer load.
ArusGrid records 5 projects being commissioned, with 117 MW of planned IT load, led by India (1 project, 67 MW), Thailand (2 projects, 30 MW) and Indonesia (2 projects, 20 MW). The largest is NTT Bengaluru 4 campus at 67 MW in Bengaluru. The operators with the most capacity at this stage are NTT (67 MW), Digital Hyperspace Malaysia (Quantum DC, HK) (20 MW), DAMAC Digital (EDGNEX) (20 MW), Datasection (10 MW) and BDx.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| NTT Bengaluru 4 campus | Devanahalli | Commissioning | 67 | undisclosed | NTT Global Data Centers | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| DAMAC Digital BKK01 (EDGNEX / Proen JV), Rama 9 | Huai Khwang (Rama 9 Road, beside Rama 9 Hospital) | Commissioning | 20 | undisclosed | Daria Data Center and Cloud Services Co (DAMAC Digital Thailand / Proen) | No signal either way |
| Datasection Bangkok AI Data Center | Bangkok | Commissioning | 10 | undisclosed | Datasection Inc. | Confirmed |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Digital Hyperspace Indonesia JKT1A, GIIC Cikarang | Cikarang, Bekasi (GIIC Zone EE) | Commissioning | 20 | undisclosed | PT Digital Hyperspace Indonesia (Quantum DC) | No signal either way |
| BDx CGK3A, Cilandak | South Jakarta | Commissioning | none published | undisclosed | BDx Indonesia | No signal either way |