Also listed as Microsoft Saudi Arabia datacenter region.
Microsoft Azure Saudi Arabia region (Eastern Province) is a data center project in Eastern Province (sites undisclosed), Saudi Arabia, operated by Microsoft. It is being commissioned. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as commissioning on 13 December 2024. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.
Dammam / Eastern Province holds 8 active projects with 370 MW of planned IT load between them, and Microsoft Azure Saudi Arabia region (Eastern Province) has no published figure so it sits outside that ranking. Of those, 4 are operational, 2 are under construction, 1 is being commissioned and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Dammam / Eastern Province, and ArusGrid does not estimate one.
Microsoft has 13 projects elsewhere in the dataset tracked by ArusGrid, including Microsoft JKT09 / JKT02 (KIIC Karawang campus), Microsoft Indonesia Central data center (Jawa Barat) and Microsoft Hyderabad Chandanvelly campus (HYD11). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as being commissioned on 13 December 2024.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 4 public sources for this project, the latest dated 24 September 2026, and last checked the record on 19 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
No public signal either way.
A chip-vendor partnership or US hyperscaler relationship has been announced, but no government document names anyone involved. Signal, not licence. Criteria are published on the Methodology page.
Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source
Built for Microsoft's own use. No customer workload has been tied to this building on the public record.
An own-use build. No colocation price applies.