center3 Dammam data center

Dammam, Eastern Province, Saudi Arabia · Dammam / Eastern Province market · location approximate to district level

center3 Dammam is a data center project in Dammam, Saudi Arabia, operated by center3. It is operational. The only published capacity figure is 20 MW of total facility power. IT load will be lower.

Latest change on record: entered the record as operational on 4 January 2024.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
20 MW
Total facility power
Running now
Not disclosed
Operator
center3
Telco
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

Carrier-neutral colocation with no AI tenant, workload or cooling disclosure.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria.

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2024-01-04Operational · capacityglobal.com

Who is behind it

Operatorcenter3 · Telco
Funder, Equitystc Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources

  1. center3: The Digital Hub Powering the MENA Region (Capacity, 2024-01-04)
  2. solutions wins SAR 364M Center3 contract to build Dammam data center (Argaam, 2026-08-04)
  3. Saudi Telecom unit in deal to build data centres across Dammam (Zawya, 2026-08-10)

More in Dammam / Eastern Province

Also run by stc

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com