ArusGrid tracks 17 active data center projects in Saudi Arabia with 1,732 MW of planned IT load, spread over 3 markets. Of these, 4 are operational, 1 is operational and expanding, 6 are under construction, 4 are at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 1,129 MW.

Riyadh is the largest market with 11 projects and 1,053 MW planned. The operators with the most planned capacity in the country are SDAIA (500 MW), DataVolt (404 MW), Humain (250 MW), AirTrunk (250 MW) and Khazna (200 MW).

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.

Markets

MarketProjectsPlanned MWUnder construction MWOperational MWColocation vacancy
Riyadh111,05366920not published
NEOM / Oxagon13603600not published
Dammam / Eastern Province532010020not published

Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
SDAIA HexagonRiyadhUnder construction480 *undisclosedSDAIA (Saudi Data and AI Authority)Confirmed
DataVolt Oxagon AI campusOxagonUnder construction360undisclosedDataVoltConfirmed
AirTrunk and Humain Riyadh campusRiyadhAnnounced250undisclosedAirTrunk and HumainLikely
Khazna Dammam campusDammamLand and permitting200undisclosedKhazna Data CentersLikely
Humain Dammam campusDammamUnder construction100undisclosedHumainLikely
Humain Riyadh campusRiyadhUnder construction100undisclosedHumainLikely
ICS Arabia Desert Dragon (Riyadh phase)Al KharjUnder construction65undisclosedICS ArabiaLikely
Humain / xAI Riyadh campusRiyadhAnnounced50undisclosedHumainLikely
DataVolt Riyadh East (First Technology Park)RiyadhLand and permitting44undisclosedDataVoltLikely
Ezditek RUH01RiyadhUnder construction24undisclosedEzditekNo signal either way
DAMAC Digital RUH-1 (Riyadh Industrial City 2)RiyadhOperational20undisclosedDAMAC Digital (EDGNEX)No signal either way
SDAIA Salboukh data centreSalboukhLand and permitting20undisclosedSDAIA (Saudi Data and AI Authority)No signal either way
center3 DammamDammamOperational20 *undisclosedcenter3No signal either way
Aramco Digital Dammam (GroqCloud region)DammamOperationalnone publishedundisclosedAramco DigitalConfirmed
DAMAC Digital DMM-1 (Dammam)DammamOperationalnone publishedundisclosedDAMAC Digital (EDGNEX)No signal either way
Humain Al-Saad campusRiyadhLand and permittingnone publishedundisclosedHumainLikely
center3 Riyadh (Khurais)RiyadhExpandingnone publishedundisclosedcenter3No signal either way

Other countries

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.