ArusGrid tracks 17 active data center projects in Saudi Arabia with 1,732 MW of planned IT load, spread over 3 markets. Of these, 4 are operational, 1 is operational and expanding, 6 are under construction, 4 are at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 1,129 MW.
Riyadh is the largest market with 11 projects and 1,053 MW planned. The operators with the most planned capacity in the country are SDAIA (500 MW), DataVolt (404 MW), Humain (250 MW), AirTrunk (250 MW) and Khazna (200 MW).
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.
| Market | Projects | Planned MW | Under construction MW | Operational MW | Colocation vacancy |
|---|---|---|---|---|---|
| Riyadh | 11 | 1,053 | 669 | 20 | not published |
| NEOM / Oxagon | 1 | 360 | 360 | 0 | not published |
| Dammam / Eastern Province | 5 | 320 | 100 | 20 | not published |
Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| SDAIA Hexagon | Riyadh | Under construction | 480 * | undisclosed | SDAIA (Saudi Data and AI Authority) | Confirmed |
| DataVolt Oxagon AI campus | Oxagon | Under construction | 360 | undisclosed | DataVolt | Confirmed |
| AirTrunk and Humain Riyadh campus | Riyadh | Announced | 250 | undisclosed | AirTrunk and Humain | Likely |
| Khazna Dammam campus | Dammam | Land and permitting | 200 | undisclosed | Khazna Data Centers | Likely |
| Humain Dammam campus | Dammam | Under construction | 100 | undisclosed | Humain | Likely |
| Humain Riyadh campus | Riyadh | Under construction | 100 | undisclosed | Humain | Likely |
| ICS Arabia Desert Dragon (Riyadh phase) | Al Kharj | Under construction | 65 | undisclosed | ICS Arabia | Likely |
| Humain / xAI Riyadh campus | Riyadh | Announced | 50 | undisclosed | Humain | Likely |
| DataVolt Riyadh East (First Technology Park) | Riyadh | Land and permitting | 44 | undisclosed | DataVolt | Likely |
| Ezditek RUH01 | Riyadh | Under construction | 24 | undisclosed | Ezditek | No signal either way |
| DAMAC Digital RUH-1 (Riyadh Industrial City 2) | Riyadh | Operational | 20 | undisclosed | DAMAC Digital (EDGNEX) | No signal either way |
| SDAIA Salboukh data centre | Salboukh | Land and permitting | 20 | undisclosed | SDAIA (Saudi Data and AI Authority) | No signal either way |
| center3 Dammam | Dammam | Operational | 20 * | undisclosed | center3 | No signal either way |
| Aramco Digital Dammam (GroqCloud region) | Dammam | Operational | none published | undisclosed | Aramco Digital | Confirmed |
| DAMAC Digital DMM-1 (Dammam) | Dammam | Operational | none published | undisclosed | DAMAC Digital (EDGNEX) | No signal either way |
| Humain Al-Saad campus | Riyadh | Land and permitting | none published | undisclosed | Humain | Likely |
| center3 Riyadh (Khurais) | Riyadh | Expanding | none published | undisclosed | center3 | No signal either way |
SDAIA · DataVolt · Humain · AirTrunk · Khazna · DAMAC Digital (EDGNEX) · stc