ArusGrid tracks 1 active data center project in NEOM / Oxagon, Saudi Arabia, with 360 MW of planned IT load. It is under construction. Projects under construction or commissioning account for 360 MW.
The operators with the most planned capacity here are DataVolt (360 MW across 1 project). No third party publishes a colocation vacancy rate for NEOM / Oxagon, and ArusGrid does not estimate one.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| DataVolt Oxagon AI campus | Oxagon | Under construction | 360 | undisclosed | DataVolt | Confirmed |
All projects in Saudi Arabia · Full directory