ArusGrid tracks 1 active data center project in Jeddah / Western, Saudi Arabia, with 50 MW of planned IT load. It is announced only.
The operators with the most planned capacity here are ICS Arabia (50 MW across 1 project). No third party publishes a colocation vacancy rate for Jeddah / Western, and ArusGrid does not estimate one.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| ICS Arabia Desert Dragon (Jeddah phase) | Jeddah | Announced | 50 * | undisclosed | ICS Arabia (with Lumaotong Group and China Mobile International) | No signal either way |
All projects in Saudi Arabia · Full directory