ArusGrid tracks 2 active data center projects operated by ICS Arabia, with 115 MW of planned IT load, across Saudi Arabia. Of these, 1 is under construction and 1 is announced only. Projects under construction or commissioning account for 65 MW.
ArusGrid classes the operator as colocation. Projects appear under the names ICS Arabia (with Lumaotong Group and China Mobile International). The largest project is ICS Arabia Desert Dragon (Riyadh phase) at 65 MW in Riyadh, under construction. Named funders across its projects are Lumaotong Group and China Mobile International. Disclosed tenants across its projects are XDS Datacentres.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| ICS Arabia Desert Dragon (Riyadh phase) | Al Kharj | Under construction | 65 | undisclosed | ICS Arabia | Likely |
| ICS Arabia Desert Dragon (Jeddah phase) | Jeddah | Announced | 50 * | undisclosed | ICS Arabia (with Lumaotong Group and China Mobile International) | No signal either way |
All operators · Full directory