ICS Arabia Desert Dragon (Jeddah phase) is a data center project in Jeddah, Saudi Arabia, operated by ICS Arabia (with Lumaotong Group and China Mobile International). It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 50 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 20 September 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
ICS Arabia (with Lumaotong Group and China Mobile International)
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

ICS Arabia Desert Dragon (Jeddah phase) is the only active project ArusGrid tracks in Jeddah / Western, at 50 MW of planned IT load. No third party publishes a colocation vacancy rate for Jeddah / Western, and ArusGrid does not estimate one.

ICS Arabia has 1 other in Saudi Arabia tracked by ArusGrid, including ICS Arabia Desert Dragon (Riyadh phase). It sits on the ICS Arabia Desert Dragon campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 20 September 2024. Cooling uses immersion cooling.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 3 public sources for this project, the latest dated 14 July 2025, and last checked the record on 19 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Phases

Phase 2 (Jeddah) · Announced50 MW, target Q4 2026

Stage history

2024-09-20Announced · guest.meed.com

Who is behind it

OperatorICS Arabia (with Lumaotong Group and China Mobile International) · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated byMODON · Sep 2024 Reported source ↗
Land secured through MODON for the Desert Dragon programme as a whole. The Jeddah plot is not specified.
Water and cooling
CoolingImmersion cooling Reported source ↗
DCD says the Desert Dragon facilities will use immersive cooling. This is stated for the programme, not the Jeddah site alone.

Sources checked 2026-10-19

  1. Construction to start on $1.9bn Saudi data centres (MEED, 2024-09-20)
  2. ICS Arabia breaks ground on 187MW Desert Dragon project (DCD, 2024-10-01)
  3. XDS DATACENTRES Signs 15-Year Deal to Host 10MW of AI Workloads in Saudi's Desert Dragons Facilities (ACN Newswire, 2025-07-14)

Also run by ICS Arabia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.