ICS Arabia Desert Dragon (Riyadh phase) is a data center project in Al Kharj, Saudi Arabia, operated by ICS Arabia. It is under construction. It is planned for 65 MW of IT load.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
A reported 15-year lease for 10MW of AI workload capacity. Stated AI positioning by the operator.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.
Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source