Dawiyat Riyadh data centre

Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

Dawiyat Riyadh data centre is a data center project in Riyadh, Saudi Arabia, operated by Dawiyat Integrated Telecommunications and Information Technology Company. It is under construction. The published capacity figure is 48 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as under construction on 24 March 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
48 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Dawiyat Integrated Telecommunications and Information Technology Company
Telco
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and Dawiyat Riyadh data centre ranks 8th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

It is the only Saudi Electricity Company project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 24 March 2025.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 4 public sources for this project, the latest dated 29 April 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2025-03-24Under construction · guest.meed.com

Who is behind it

OperatorDawiyat Integrated Telecommunications and Information Technology Company · Telco

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. Construction starts for 48MW Riyadh data centre (MEED, 2025-03-24)
  2. Saudi Arabia signs 2 agreements to build 16MW Tier III data center (Mubasher, 2026-04-29)
  3. Construction starts for 48MW Riyadh data centre (MEED, 2025-03-24)
  4. Saudi Arabia signs 2 agreements to build 16MW Tier III data center (Mubasher (Argaam/Sharikat Mubasher), 2026-04-29)

More in Riyadh

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.