NHC Innovation Khuzam Digital Valley data centre

Riyadh (Khuzam), Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

NHC Innovation Khuzam Digital Valley data centre is a data center project in Riyadh (Khuzam), Saudi Arabia, operated by NHC Innovation. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 65 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 6 September 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
65 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
NHC Innovation
Local developer
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and NHC Innovation Khuzam Digital Valley data centre ranks 5th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

It is the only National Housing Company project ArusGrid tracks. It sits on the Khuzam Digital Valley campus. Named users of the compute are BytePlus and NAVER Innovation (reported, unconfirmed).

The build is phased. Phase 1 at 15 MW is announced with a 2027 target; Later phases (to 65MW) at 50 MW is announced with a 2033 target. The stage was recorded as announced only on 6 September 2026. The money on record is SAR 3.3bn (about US$880m) as of September 2026, the announced investment.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 5 public sources for this project, the latest dated 9 September 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Two cloud providers, BytePlus and NAVER Innovation, are reported as the first customers.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Phases

Phase 1 · Announced15 MW, target 2027
Later phases (to 65MW) · Announced50 MW, target 2033

Stage history

2026-09-06Announced · menastartupdigest.com

Who is behind it

OperatorNHC Innovation · Local developer

Who uses the compute

Tenant · hyperscalerBytePlus · reported, unconfirmed

First customer named at launch · as of 2026-09-06

Named as one of the first two customers of the Khuzam data centre in the sponsor's LEAP remarks, reported by a secondary outlet. No lease terms.

Source · NHC Innovation Begins SAR 3.3B Khuzam Digital Valley Data Centre Project (MENA Startup Digest, 2026-09-06)

Tenant · hyperscalerNAVER Innovation · reported, unconfirmed

First customer named at launch; Naver Cloud and NHC Innovation joint venture · as of 2026-09-06

Named as one of the first two customers of the Khuzam data centre in the sponsor's LEAP remarks, reported by a secondary outlet. No lease terms.

Source · NHC Innovation Begins SAR 3.3B Khuzam Digital Valley Data Centre Project (MENA Startup Digest, 2026-09-06)

Money at this site

Announced investment, 2026-09SAR 3.3bn (about US$880m)

The figure covers the whole campus.

Colocation price per kW of IT load per month

A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. NHC Innovation Begins SAR 3.3B Khuzam Digital Valley Data Centre Project (MENA Startup Digest, 2026-09-06)
  2. National Housing Company Invests About 880 Million in Riyadh Data Center (Sudan Independent (republishing Asharq Al-Awsat), 2026-09-09)
  3. Al-Hogail launches Khuzam Digital Valley at Real Estate Future Forum (Argaam, 2026-01-26)
  4. Naver Expands Its AI Footprint in Saudi Arabia… Blueprint for Sovereign and Data Centers (Edaily, 2026-09-02)
  5. وزير البلديات والإسكان يدشّن مدينة «خزام ديجيتال فالي» في منتدى مستقبل العقار (Okaz, 2026-01-26)

More in Riyadh

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.