Humain and center3 Riyadh AI data centre

Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

Humain and center3 Riyadh AI data centre is a data center project in Riyadh, Saudi Arabia, operated by Humain and center3. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.

Latest change on record: entered the record as announced on 6 October 2026. Record last checked against its sources on 10 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Humain and center3
Joint venture
AI workloads
Likely
Evidence grade
Sourced

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 12 active projects with 1,103 MW of planned IT load between them, and Humain and center3 Riyadh AI data centre ranks 6th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 4 are under construction, 3 are at the land and permitting stage and 3 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

Humain has 4 others in Saudi Arabia tracked by ArusGrid, including Humain Dammam campus, Humain Riyadh campus and Humain / xAI Riyadh campus. Named funding comes from Humain and stc Group. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 at 16 MW is announced with a 2028 target; Phase 2 (to 50MW total) at 34 MW is announced. The stage was recorded as announced only on 6 October 2026.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 1 public source for this project, the latest dated 6 October 2026, and last checked the record on 10 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Joint AI data centre of Humain and center3 with four high-density halls of 11.2MW each.

Access to AI chips

GradeGovernment-confirmed

A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationYes
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Humain · Commerce Department authorisation of 2025-11-19 for up to 35,000 Nvidia GB300 accelerators, case by case, subject to security and reporting conditions with ongoing BIS monitoring. (2025-11-20) source

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Phases

Phase 1 · Announced16 MW, target 2028
Phase 2 (to 50MW total) · Announced34 MW

Stage history

2026-10-06Announced · meed.com

Who is behind it

OperatorHumain and center3 · Joint venture
Funder, Joint venture partnerHumain
Funder, Joint venture partnerstc Group

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Who builds it
Main contractorHassan Allam Construction and Sterling and Wilson (JV) · SAR 750m (≈US$200m) · Oct 2026 Reported source ↗
Phase 1 civil, architectural, MEP and infrastructure works, 16-month programme

Sources checked 2026-10-10

  1. Joint venture wins Riyadh data centre construction deal (MEED, 2026-10-06)

More in Riyadh

Also run by Humain

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-10.