ArusGrid tracks 2 active data center projects in Qatar with 62 MW of planned IT load, spread over 1 market. Of these, 1 is operational and expanding and 1 is past financial close. Disclosed running capacity is 18 MW.
Doha is the largest market with 2 projects and 62 MW planned. The operators with the most planned capacity in the country are Meeza (62 MW).
The US export control position for advanced AI chips in Qatar, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.
| Market | Projects | Planned MW | Under construction MW | Operational MW | Colocation vacancy |
|---|---|---|---|---|---|
| Doha | 2 | 62 | 0 | 18 | not published |
Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Meeza M-VAULT 6, 7 and 8 | Doha | Financing closed | 44 | undisclosed | Meeza QSTP LLC | Likely |
| Meeza M-VAULT 1 to 5 (Doha portfolio) | Doha | Expanding | 18 | 18 | Meeza QSTP LLC | Likely |