Data center projects in Doha

Qatar · The Gulf · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects in Doha, Qatar, with 62 MW of planned IT load. Of these, 1 is operational and expanding and 1 is past financial close. Operators have disclosed 18 MW actually running, a figure most of them do not publish.

The largest project is Meeza M-VAULT 6, 7 and 8 at 44 MW, past financial close. The operators with the most planned capacity here are Meeza (62 MW across 2 projects). No third party publishes a colocation vacancy rate for Doha, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in Qatar, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Meeza M-VAULT 6, 7 and 8DohaFinancing closed44undisclosedMeeza QSTP LLCLikely
Meeza M-VAULT 1 to 5 (Doha portfolio)DohaExpanding1818Meeza QSTP LLCLikely

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.