Digital Hyperspace Indonesia JKT1A, GIIC Cikarang data center

Cikarang, Bekasi (GIIC Zone EE), West Java, Indonesia · Greater Jakarta market · location approximate to district level

Digital Hyperspace Indonesia JKT1A, GIIC Cikarang is a data center project in Cikarang, Bekasi (GIIC Zone EE), Indonesia, operated by PT Digital Hyperspace Indonesia (Quantum DC). It is being commissioned. It is planned for 20 MW of IT load.

Open on the mapSuggest a correction
Stage
Commissioning
Planned IT load
20 MW
Running now
Not disclosed
Operator
PT Digital Hyperspace Indonesia (Quantum DC)
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: named funder, disclosed client (reported), dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Project Ignite (Phase 1) · Commissioning20 MW, target 2025

Who is behind it

OperatorPT Digital Hyperspace Indonesia (Quantum DC) · Colocation
Funder, EquityQuantum DC (HK)
Funder, EquityGlobal Telecom Capital (GTC) Fund

Who uses the compute

Tenant · telcoChina Telecom · reported, unconfirmed

Money at this site

ArusGrid estimate, building costabout US$191m to US$258m

No figure has been announced. This range is 20 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Industrial estateGreenland International Industrial Center (GIIC), Kota Deltamas · 6.8 ha · Sep 2023 Confirmed source ↗
Operator gives a 6.8 hectare plot within the GIIC Deltamas campus. Its location page gives about 68,000 sqm, enough for an ultimate campus of about 80MW. Seller and tenure not stated.
Power supply
Grid supplyGrid via GI Cibatu and GI Deltamas substations (GI Switching 1 in GIIC) · 146 MVA · Sep 2023 Confirmed source ↗
Operator fact sheet gives total power capacity of 126MW and 146MVA against 20MW of IT. Supply comes from the GI Cibatu and GI Deltamas substations about 6.5km away, through GI Switching 1 inside GIIC. The utility is not named, and the capacity appears to cover the full campus. · Applies to the whole campus.
Water and cooling
CoolingWater-cooled chillers Confirmed source ↗
N+1 water-cooled chillers with dual water supply.

Sources

  1. dh-indonesia.com
  2. uptimeinstitute.com
  3. datacentermap.com
  4. Digital Hyperspace JKT1A Tier III Certification of Constructed Facility (Uptime Institute, 2025-03-24)
  5. Solution – Our Services offer the Best deal for your Data (PT Digital Hyperspace Indonesia, 2023-09-06)
  6. Location – Our Data Center Building in Indonesia (PT Digital Hyperspace Indonesia, 2023-08-30)