SpaceDC JAK1 (ID01 campus), West Jakarta is a data center project in West Jakarta (Kalideres), Indonesia, operated by SpaceDC. It is on hold. It is planned for 24 MW of IT load.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.
The announcement stands alone, or the project is on hold. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.
Published design density is 6 to 8kW/rack average (water-cooled racks up to 50kW offered); 2020 to 2021 design era.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No figure has been announced. This range is 24 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
All projects in Greater Jakarta · All projects in Indonesia · All projects on hold · Data center rules in Indonesia · Full directory