Directory › Indonesia › Greater Jakarta › SpaceDC JAK1 (ID01 campus), West Jakarta

SpaceDC JAK1 (ID01 campus), West Jakarta

West Jakarta (Kalideres), DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to district level
Why it is on hold. A partner walked awayNo progress on record The 24MW build was never reported started. The sister building was sold in 2022, the site now sits beside Digital Realty Bersama's West Jakarta campus, and the operator has said nothing about Indonesia since 2022. source The graveyard.

SpaceDC JAK1 (ID01 campus), West Jakarta is a data center project in West Jakarta (Kalideres), Indonesia, operated by SpaceDC. It is on hold. It is planned for 24 MW of IT load.

Open on the mapSuggest a correction
Stage
On hold
Planned IT load
24 MW
Running now
Not disclosed
Operator
SpaceDC
Colocation
AI workloads
Unlikely
Evidence grade
Thin
Will it get built?Stalled2 of 7 gates passed
○ Land secured✓ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

The announcement stands alone, or the project is on hold. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusUnlikely

Published design density is 6 to 8kW/rack average (water-cooled racks up to 50kW offered); 2020 to 2021 design era.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Who is behind it

OperatorSpaceDC · Colocation
Funder, EquityGIC

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$229m to US$309m

No figure has been announced. This range is 24 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Power supply
Own generationon-site natural gas generators · Sep 2019 Reported source ↗
2019 design, on-site gas generation with UPS and diesel backup; waste heat to absorption cooling · Applies to the whole campus.

Sources

  1. spacedc.com
  2. datacenterdynamics.com
  3. Digital Realty Enters Indonesia Through Formation of New Joint Venture (Digital Realty via PR Newswire, 2025-03-18)
  4. BDDC hadirkan pusat data dalam kota berkapasitas 60 MW (ANTARA, 2023-05-09)
  5. Polymer Connected rebrands as SpaceDC, gives details of Jakarta campus plans (DCD, 2019-09-18)