ArusGridProject
Directory › Indonesia › Greater Jakarta › DCI E1, Downtown Jakarta

DCI E1, Downtown Jakarta data center

Jakarta, DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to city level

DCI E1, Downtown Jakarta is a data center project in Jakarta, Indonesia, operated by DCI Indonesia. It is operational. It is planned for 18 MW of IT load. The operator reports 18 MW running.

Latest change on record: entered the record as operational on 18 December 2023.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
18 MW
Running now
18 MW
Operator
DCI Indonesia
Colocation
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, three or more sources. Criteria.

AI workloads

StatusUnlikely

Downtown interconnection/enterprise facility adjacent to the IIX (Cyber 1) and Open-IX (Duren Tiga) exchanges; Tier IV but interconnection-focused, not built for high-density AI.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2023-12-18Operational · dci-indonesia.com

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, EquitySalim Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$172m to US$232m

No figure has been announced. This range is 18 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources

  1. dci-indonesia.com
  2. DCI Indonesia and Salim Group, Inaugurate First Tier IV Data Center in Downtown Jakarta (DCI Indonesia, 2023-12-18)
  3. DCI Indonesia celebrates Tier IV certification milestone (BTW Media, 2024-08-14)