DCI H2 Campus (H2-01, H2-02), Karawang is a data center project in Karawang, Indonesia, operated by DCI Indonesia. It is operational and expanding. It is planned for 600 MW of IT load. The operator reports 27 MW running.

Latest change on record: moved to expanding on 21 October 2021.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
600 MW
Running now
27 MW
Operator
DCI Indonesia
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

600MW-scale greenfield hyperscale campus with dedicated 30MW on-site solar PV; positioned by DCI/Salim for hyperscale and AI workloads. No disclosed cooling/rack-density spec.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

H2-01 · Operational15 MW, target 2021
H2-02 (solar-powered) · Operational12 MW, target 2023
H2-03 · AnnouncedSize not published

Stage history

2021-06-21Under construction · dci-indonesia.com
2021-10-21Expanding · market.bisnis.com

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, Joint venture partnerSalim Group
Funder, EquityAnthoni Salim

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

ArusGrid estimate, building costabout US$5.7bn to US$8.5bn

No figure has been announced. This range is 600 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Industrial estatePertiwi Lestari Industrial Estate (Salim Group) · 86 ha · Jun 2023 Confirmed source ↗
Power supply
On-site solarDCI Indonesia (own solar) · 30 MW · Jun 2023 Confirmed source ↗
Solar of up to 30MW on 30ha inside the 86ha H2 campus. No grid utility is named. · Applies to the whole campus.

Sources

  1. dci-indonesia.com
  2. datacenterdynamics.com
  3. thetechcapital.com
  4. DCII Ekspansi Data Center di 2026, Eskalasi Kapasitas Hingga 2.000 MW (EmitenNews, 2026-03-31)
  5. DCII Non-Rated (KB Valbury Sekuritas, 2026-07-16)
  6. Gandeng DCII, Grup Salim Mulai Operasikan Data Center 15 MW (Bisnis.com, 2021-10-21)
  7. PT DCI Indonesia Tbk (DCI) Announces The Construction of the Second Location Hyperscale Data Center Campus (H2) (DCI Indonesia, 2021-06-21)
  8. DCI Indonesia and Salim Group Inaugurate Second Data Center in Karawang, Pioneering the First Solar-Powered Data Center in Indonesia (DCI Indonesia, 2023-06-22)

More in Greater Jakarta

Also run by DCI Indonesia

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com