ArusGridProject
Directory › Indonesia › Greater Jakarta › STT Jakarta 7 to 9 (future phases)

STT Jakarta 7 to 9 (future phases) data center

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

STT Jakarta 7 to 9 (future phases) is a data center project in Cikarang, Bekasi, Indonesia, operated by STT GDC Indonesia. It has been announced and has not yet reached the land or permitting stage. It is planned for 180 MW of IT load.

Latest change on record: entered the record as announced on 10 June 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
180 MW
Running now
0 MW
Operator
STT GDC Indonesia
Joint venture
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Open question3 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

How well evidenced is it

One or two hard signals sit behind the announcement. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusLikely

Same campus, engineered for Nvidia Vera Rubin-class systems.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

STT Jakarta 7 · Announced60 MW
STT Jakarta 8 · Announced60 MW
STT Jakarta 9 · Announced60 MW

Stage history

2026-06-10Announced · fortuneidn.com

Who is behind it

OperatorSTT GDC Indonesia · Joint venture
Funder, Joint venture partnerTriputra Group
Funder, EquityKKR
Funder, EquitySingtel

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$1.7bn to US$2.6bn

No figure has been announced. This range is 180 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01
US$5.1bn

Platform capital spans several sites. It is never added to this project's own figure.

Land
Industrial estateGreenland International Industrial Center (GIIC) · Jun 2026 Reported source ↗
Site is the STT Jakarta Campus at GIIC, Cikarang, Bekasi. The campus is planned for nine data centres totalling 360 MW. Jakarta 7, 8 and 9 are each 60 MW and listed as planned. Seller or lease terms are not disclosed.
Power supply
Dedicated substationPLN · Jun 2026 Reported source ↗
An energised on-site high-voltage substation serves the nine-building STT Jakarta campus in Cikarang. · Applies to the whole campus.
Dedicated substationSTT GDC on-site substation fed by PLN · Jun 2026 Reported source ↗
Campus-level fact; release does not name Jakarta 7 to 9 specifically.

Sources

  1. sttelemediagdc.com
  2. datacenterdynamics.com
  3. STT GDC Indonesia accelerates expansion with four new data centres (IDNFinancials, 2026-06-10)
  4. KKR-Singtel Consortium Completes Acquisition of STTGDC; Company Launches Refreshed Global Brand for Next Phase of Growth (STT GDC via Access Newswire, 2026-09-01)
  5. AI Makin Masif, STT GDC Agresif Ekspansi Empat Data Center (Fortune Indonesia, 2026-06-10)
  6. STT GDC Accelerates Jakarta Campus Expansion to Power Indonesia's AI and Digital Ambitions (STT GDC, 2026-06-10)
  7. Ekspansi Jakarta Campus Data Center, STT GDC Perkuat Fondasi Digital Indonesia dengan 4 Fasilitas dan Kapasitas AI Hingga 360 MW (Mobitekno, 2026-11-06)

Same campus, STT Jakarta Campus (GIIC)

More in Greater Jakarta

Also run by STT GDC

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com