STT GDC Bengaluru Devanahalli campus is a data center project in Devanahalli, India, operated by STT GDC India. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 100 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as announced on 25 September 2026. Record last checked against its sources on 10 October 2026.
How India approves, powers and taxes data centers is on Data center rules in India.
Bengaluru holds 4 active projects with 232 MW of planned IT load between them, and STT GDC Bengaluru Devanahalli campus ranks first by planned capacity. Of those, 2 are operational and 2 are announced only. Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.
STT GDC has 9 others in India and 15 projects elsewhere in the dataset tracked by ArusGrid, including STT GDC Pune campus (Dighi), STT Chennai Ambattur campus (Chennai 2, 3 and 4) and STT GDC Palava campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 25 September 2026. The money on record is INR 50bn (about US$581m) as of September 2026, the announced investment.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 1 public source for this project, the latest dated 25 September 2026, and last checked the record on 10 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Bengaluru · All projects in India · All STT GDC projects · All projects announced only · Data center rules in India · Full directory