ArusGrid tracks 1 active data center project in Bengaluru, India, with 67 MW of planned IT load. It is being commissioned. Projects under construction or commissioning account for 67 MW.
The operators with the most planned capacity here are NTT (67 MW across 1 project). Published colocation vacancy in Bengaluru was 37% as of June 2025. Vacancy excludes hyperscaler self-build.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| NTT Bengaluru 4 campus | Devanahalli | Commissioning | 67 | undisclosed | NTT Global Data Centers | Likely |
All projects in India · Full directory