ArusGrid tracks 2 active data center projects in Kolkata, India, with 100 MW of planned IT load. Of these, 2 are operational. Operators have disclosed 16 MW actually running, a figure most of them do not publish.
The largest project is CtrlS Kolkata at 60 MW, operational. The operators with the most planned capacity here are CtrlS (60 MW across 1 project) and NTT (40 MW across 1 project). Published colocation vacancy in Kolkata was 17% as of June 2025. Vacancy excludes hyperscaler self-build.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| CtrlS Kolkata | New Town, Kolkata | Operational | 60 | 16 | CtrlS Datacenters | No signal either way |
| NTT Kolkata 1 campus | New Town, Kolkata | Operational | 40 | undisclosed | NTT Global Data Centers | No signal either way |
All projects in India · Full directory