NTT Kolkata 1 campus is a data center project in New Town, Kolkata, India, operated by NTT Global Data Centers. It is operational. It is planned for 25 MW of IT load. The operator reports 6.4 MW running.

Latest change on record: moved to operational on 10 February 2025.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
25 MW
Running now
6.4 MW
Operator
NTT Global Data Centers
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Phase 1 · Operational6 MW, target 2024
Two inaugurated buildings · Operational40 MW, target 2025

Stage history

2023-02Under construction · outlookbusiness.com
2025-02-10Operational · w.media

Who is behind it

OperatorNTT Global Data Centers · Colocation
Funder, EquityNTT DATA

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$141m to US$191m

No figure has been announced. This range is 25 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Allocated byWBHIDCO · 7.5 acres Reported source ↗
Bengal Silicon Valley Tech Hub, Action Area II
Water and cooling
Cooling Confirmed source ↗
Operator page gives cooling as 'Continuous mechanical cooling with N+1 redundancy'. Medium (air or water) not stated.
Cooling Confirmed source ↗
The operator page for Kolkata 1 specifies continuous mechanical cooling with N+1 redundancy. It does not say whether the chillers are air-cooled or water-cooled, so the cooling type is left null. Held notes say no source names the cooling.

Sources

  1. NTT Global Data Centers inaugurates 40 MW DC facility in Kolkata (W.Media, 2025-02-10)
  2. NTT launches Kolkata data center campus in West Bengal, India (DCD, 2025-02-07)
  3. Kolkata 1 campus, 25+MW capacity, 2 data centers (NTT Global Data Centers, 2026-10-02)
  4. NTT Plans Rs 2000 Crore Investment In Kolkata Data Centre (Outlook Business, 2023-02-14)
  5. NTT to Build its First Data Center Facility in Kolkata, India (W.Media, 2023-02-14)
  6. NTT Global Data Centers inaugurates 40 MW DC facility in Kolkata (W.Media, 2025-02-10)
  7. Kolkata 1 Data Center (NTT DATA)
  8. NTT Global Data Centers & Cloud Infrastructure India Private Limited: Ratings reaffirmed and assigned for enhanced amount for bank facilities, reaffirmed for NCDs (ICRA, 2026-09-22)

More in Kolkata

Also run by NTT

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com