ArusGridProject
Directory › India › Kolkata › STT GDC Kolkata New Town

STT GDC Kolkata New Town data center

New Town, Kolkata, West Bengal, India · Kolkata market · location approximate to district level

STT GDC Kolkata New Town is a data center project in New Town, Kolkata, India, operated by STT GDC India. It is operational. It is planned for 25 MW of IT load.

Latest change on record: moved to operational on 1 April 2025.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
25 MW
Running now
Not disclosed
Operator
STT GDC India
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: committed or approved capital, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

Marketed as AI ready with liquid cooling readiness. No tenant named.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2023-04Under construction · itewb.gov.in
2025-04-01Operational · sttgdc.com

Who is behind it

OperatorSTT GDC India · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-04INR 4.5bn (about US$53m)

The figure covers the whole campus.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Industrial estateWBHIDCO (West Bengal Housing Infrastructure Development Corporation), Bengal Silicon Valley Tech Hub · 5.59 acres · Apr 2025 Inferred by ArusGrid source ↗
Plot SV-10, Silicon Valley Hub, New Town Action Area-II. Terms of allotment not disclosed.
Why we think so. STT gives the site as 5.59 acres at Plot SV-10 in the Silicon Valley Hub, New Town. That hub is the Bengal Silicon Valley Tech Hub that WBHIDCO develops and allots, as for the NTT and Nxtra plots nearby. STT does not name the landowner.
Power supply
Grid supply33kV · Dec 2024 Confirmed source ↗
Two diverse and redundant 33kV utility power supplies. Utility not named.
Water and cooling
CoolingClosed-loop cooling Confirmed source ↗
Closed-loop cooling with low-GWP refrigerants, liquid-cooling ready. Rainwater harvesting and greywater reuse.
CoolingAir cooled Confirmed source ↗
Redundant air-cooled chillers with quick restart, CRAC and fan wall units with EC fans, and 5 minutes of thermal energy storage. Designed for up to 120kW per rack with liquid cooling.

Sources

  1. STT GDC India Unveils AI-Ready Data Centre Campus in Kolkata (STT GDC India, 2025-04-01)
  2. STT Kolkata 2 Factsheet (STT GDC India, 2025-06)
  3. Factsheet STT Kolkata 2 (STT GDC India, 2024-12)
  4. STT Kolkata 2 Factsheet (STT GDC India, 2026-02)
  5. ST Telemedia Global Data Centres (India) Unveils AI-Ready Data Centre Campus in Kolkata with INR 450 Crore Investment (STT GDC India, 2025-04-01)
  6. Monthly Administrative Report April 2023 (Department of Information Technology & Electronics, Government of West Bengal)

More in Kolkata