ArusGridCity
Directory › India › Kolkata › New Town

Data centers in New Town

India · dataset updated 2026-10-02

ArusGrid tracks 4 active data center projects in New Town, India, with 150 MW of planned IT load. Of these, 3 are operational and 1 is under construction. Projects under construction or commissioning account for 25 MW. Operators have disclosed 22 MW actually running.

New Town sits in the Kolkata market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is CtrlS Kolkata at 60 MW, operational. The operators with the most planned capacity here are CtrlS (60 MW across 1 project), NTT (40 MW across 1 project) and Nxtra (25 MW across 1 project).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
CtrlS KolkataNew Town, KolkataOperational6016CtrlS DatacentersNo signal either way
NTT Kolkata 1 campusNew Town, KolkataOperational40 *6.4NTT Global Data CentersNo signal either way
Nxtra Kolkata (Bengal Silicon Valley)New Town, KolkataUnder construction25undisclosedNxtra by AirtelLikely
STT GDC Kolkata New TownNew Town, KolkataOperational25undisclosedSTT GDC IndiaNo signal either way

Market pages

Other cities in India

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.