ArusGrid tracks 3 active data center projects operated by CtrlS, with 382 MW of planned IT load, across India. Of these, 2 are operational and 1 is under construction. Projects under construction or commissioning account for 250 MW. Disclosed running capacity is 16 MW. 1 project on record was cancelled and is excluded from every total.

ArusGrid classes the operator as colocation. Projects appear under the names CtrlS Datacenters. The largest project is CtrlS Chandanvelly datacenter park at 250 MW in Hyderabad, under construction. Named funders across its projects are CtrlS Datacenters. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
CtrlS Chandanvelly datacenter parkChandanvellyUnder construction250 *undisclosedCtrlS DatacentersLikely
CtrlS Chennai datacenter park (DC1 and DC2)ChennaiOperational72undisclosedCtrlS DatacentersLikely
CtrlS KolkataNew Town, KolkataOperational6016CtrlS DatacentersNo signal either way

Cancelled

ProjectCityStagePlanned MWRunning MWOperatorAI
CtrlS Datacenters EECd Hyperscale Campus (with National Telecom)Si Racha (EECd / Digital Park Thailand)Cancelled150undisclosedCtrlS DatacentersLikely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.