CtrlS Mumbai datacenter campus (DC1 to DC7) is a data center project in Navi Mumbai, India, operated by CtrlS Datacenters. It is operational. The published capacity figure is 214 MW, and its basis is not stated as IT load. The operator reports 119 MW running.
Latest change on record: entered the record as operational on 6 February 2025. Record last checked against its sources on 17 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and CtrlS Mumbai datacenter campus (DC1 to DC7) ranks 5th by planned capacity. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.
CtrlS has 4 others in India tracked by ArusGrid, including CtrlS Chandanvelly datacenter park, CtrlS Bodh Gaya AI Factory and CtrlS Chennai datacenter park (DC1 and DC2). It sits on the CtrlS Navi Mumbai campus, Electronic Zone, MIDC Mahape. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. DC1 and DC2 at 40 MW is operational; DC3 at 10 MW is operational; DC4 at 37 MW is operational. The stage was recorded as operational on 6 February 2025. Power comes from CtrlS own gas insulated substation (grid utility not named) through a dedicated substation at 220 kV (reported, unconfirmed).
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 28 July 2026, and last checked the record on 17 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No AI tenant or GPU deployment is named for this campus.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Mumbai metro · All projects in India · All CtrlS projects · All projects operational · Data center rules in India · Full directory