ArusGridProject
Directory › India › Mumbai metro › AdaniConneX Taloja campus

AdaniConneX Taloja campus

Taloja, Navi Mumbai, Maharashtra, India · Mumbai metro market · location approximate to district level

AdaniConneX Taloja campus is a data center project in Taloja, Navi Mumbai, India, operated by AdaniConneX. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 240 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 6 October 2026. Record last checked against its sources on 10 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
240 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
AdaniConneX
Joint venture
AI workloads
Confirmed
Evidence grade
Corroborated

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 27 active projects with 2,400 MW of planned IT load between them, and AdaniConneX Taloja campus ranks 4th by planned capacity. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

AdaniConneX has 5 others in India tracked by ArusGrid, including AdaniConneX Hyderabad (Elikatta campus), AdaniConneX Pune and AdaniConneX Noida. It sits on the AdaniConneX Taloja campus. Named funding comes from Adani Enterprises and EdgeConneX. The named user of the compute is CoreWeave (reported, unconfirmed).

The build is phased. Building 1 at 80 MW is announced with a 2028 target; Building 2 at 80 MW is announced; Building 3 at 80 MW is announced. The stage was recorded as announced only on 6 October 2026. Cooling uses direct liquid cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 8 October 2026, and last checked the record on 10 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

CoreWeave (2026-10-06) says the Taloja buildings are designed for Nvidia Vera Rubin with direct liquid cooling for GPU data halls. Design-stage, nothing built.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Building 1 · Announced80 MW, target 2028
Building 2 · Announced80 MW
Building 3 · Announced80 MW

Stage history

2026-10-06Announced · coreweave.com

Who is behind it

OperatorAdaniConneX · Joint venture
Funder, Joint venture partnerAdani Enterprises
Funder, Joint venture partnerEdgeConneX

Who uses the compute

Tenant · GPU cloudCoreWeave · reported, unconfirmed

240 MW · Sole tenant across three 80MW buildings, Nvidia Vera Rubin platform; option to expand by up to 240MW more · as of 2026-10-06

CoreWeave's own release names AdaniConneX's Taloja campus and says CoreWeave will be the sole tenant across the three buildings. It describes plans, with no signed lease or term stated, so reported.

Source · CoreWeave Enters India, Expanding AI Cloud Platform With AdaniConneX (CoreWeave, 2026-10-06)

Source · CoreWeave to collaborate with AdaniConneX to expand AI cloud platform in India (W.Media, 2026-10-08)

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Water and cooling
CoolingDirect liquid cooling Confirmed source ↗
Direct liquid cooling for GPU halls plus a non-evaporative chilled water system (design)

Sources checked 2026-10-10

  1. CoreWeave Enters India, Expanding AI Cloud Platform With AdaniConneX (CoreWeave, 2026-10-06)
  2. CoreWeave to collaborate with AdaniConneX to expand AI cloud platform in India (W.Media, 2026-10-08)

More in Mumbai metro

Also run by AdaniConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-10.