AdaniConneX Taloja campus is a data center project in Taloja, Navi Mumbai, India, operated by AdaniConneX. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 240 MW, and its basis is not stated as IT load.
Latest change on record: entered the record as announced on 6 October 2026. Record last checked against its sources on 10 October 2026.
How India approves, powers and taxes data centers is on Data center rules in India.
Mumbai metro holds 27 active projects with 2,400 MW of planned IT load between them, and AdaniConneX Taloja campus ranks 4th by planned capacity. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.
AdaniConneX has 5 others in India tracked by ArusGrid, including AdaniConneX Hyderabad (Elikatta campus), AdaniConneX Pune and AdaniConneX Noida. It sits on the AdaniConneX Taloja campus. Named funding comes from Adani Enterprises and EdgeConneX. The named user of the compute is CoreWeave (reported, unconfirmed).
The build is phased. Building 1 at 80 MW is announced with a 2028 target; Building 2 at 80 MW is announced; Building 3 at 80 MW is announced. The stage was recorded as announced only on 6 October 2026. Cooling uses direct liquid cooling.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 8 October 2026, and last checked the record on 10 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
CoreWeave (2026-10-06) says the Taloja buildings are designed for Nvidia Vera Rubin with direct liquid cooling for GPU data halls. Design-stage, nothing built.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
240 MW · Sole tenant across three 80MW buildings, Nvidia Vera Rubin platform; option to expand by up to 240MW more · as of 2026-10-06
CoreWeave's own release names AdaniConneX's Taloja campus and says CoreWeave will be the sole tenant across the three buildings. It describes plans, with no signed lease or term stated, so reported.
Source · CoreWeave Enters India, Expanding AI Cloud Platform With AdaniConneX (CoreWeave, 2026-10-06)
Source · CoreWeave to collaborate with AdaniConneX to expand AI cloud platform in India (W.Media, 2026-10-08)
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Mumbai metro · All projects in India · All AdaniConneX projects · All projects announced only · Data center rules in India · Full directory