ArusGridProject
Directory › India › Hyderabad › AdaniConneX Hyderabad (Elikatta campus)

AdaniConneX Hyderabad (Elikatta campus)

Elikatta, Shadnagar, Telangana, India · Hyderabad market · location approximate to district level

AdaniConneX Hyderabad (Elikatta campus) is a data center project in Elikatta, Shadnagar, India, operated by AdaniConneX. It is operational. The published capacity figure is 358 MW, and its basis is not stated as IT load. The operator reports 19 MW running.

Latest change on record: entered the record as operational on 30 April 2026. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
358 MW
unstated
Running now
19 MW
Operators rarely publish this
Operator
AdaniConneX
Joint venture
AI workloads
Likely
Evidence grade
Verified

Where it sits

Hyderabad holds 12 active projects with 825 MW of planned IT load between them, and AdaniConneX Hyderabad (Elikatta campus) ranks first by planned capacity. Of those, 5 are operational, 3 are under construction, 2 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in Hyderabad was 23.4% as of June 2025. Vacancy excludes hyperscaler self-build.

AdaniConneX has 4 others in India tracked by ArusGrid, including AdaniConneX Pune, AdaniConneX Noida and AdaniConneX Chennai 1. Named funding comes from Adani Enterprises and EdgeConneX. The named user of the compute is Microsoft (reported, unconfirmed).

The build is phased. Phase I and II at 19 MW is operational with a 2026 target; Hyperscale order at 358 MW is announced. The stage was recorded as operational on 30 April 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 1 August 2026, and last checked the record on 2 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

358MW hyperscale build to suit order recorded in listed parent results, customer unnamed.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase I and II · Operational19 MW, target 2026
Hyperscale order · Announced358 MW

Stage history

2026-04-30Operational · adani.com

Who is behind it

OperatorAdaniConneX · Joint venture
Funder, Joint venture partnerAdani Enterprises
Funder, Joint venture partnerEdgeConneX

Who uses the compute

Tenant · hyperscalerMicrosoft · reported, unconfirmed

as of 2026-02-17

DCD reports an Adani partnership with Microsoft spanning Hyderabad and Pune; Adani Enterprises discloses a 358MW hyperscale order at Hyderabad without naming the customer.

Source · Adani targets 5GW of data center capacity across India (DCD, 2026-02-17)

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. Adani Enterprises Ltd announces Q4 and FY26 results (Adani Enterprises, 2026-04-30)
  2. AEL Integrated Annual Report 2024-25, Data Center section (Adani Enterprises, 2025-06-30)
  3. Adani Enterprises Ltd announces Q1-FY27 results (Adani Enterprises, 2026-07-29)
  4. Adani Enterprises Investor Presentation Q1 FY27 (Adani Enterprises, 2026-08-01)

More in Hyderabad

Also run by AdaniConneX

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.