AdaniConneX Chennai 1 is a data center project in Chennai, India, operated by AdaniConneX. It is operational. It is planned for 33 MW of IT load. The operator reports 17 MW running.
Latest change on record: entered the record as operational on 4 November 2022.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Running capacity. The site is operational or expanding. On record: named funder, disclosed client (confirmed), dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.
14MW of data centre capacity at Siruseri SIPCOT, Chennai, for AI training and inference. OneQode and AdaniConneX are discussing more capacity of up to 114MW in India. · as of 2026-10-28
The OneQode release names AdaniConneX capacity at Siruseri SIPCOT, Chennai, but not the building. Chennai 1 (site ACXMAA01 at Kazhipathur, next to SIPCOT IT Park Siruseri) is the AdaniConneX Chennai campus at that location, so the link to this row is ours. OneQode is a GPU cloud operator, not a hyperscaler.
Source · OneQode Signs 14 MW AI Capacity Agreement with AdaniConneX, with a Path to 114 MW (OneQode (PR Newswire via Kyodo News PRWire), 2026-10-28)
No figure has been announced. This range is 33 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.