Equinix CN1 Chennai data center

Siruseri, Chennai, Tamil Nadu, India · Chennai market

Equinix CN1 Chennai is a data center project in Siruseri, Chennai, India, operated by Equinix. It is operational. It is planned for 24 MW of IT load. The operator reports 3.24 MW running.

Latest change on record: entered the record as operational on 19 September 2025.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
24 MW
Running now
3.24 MW
Operator
Equinix
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Running capacity. The site is operational or expanding. On record: named funder, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

Phase 1, 800 cabinets · Operational3.24 MW, target 2025
Full build, 4,250 cabinets · Announced24 MW

Stage history

2025-09-19Operational · newsroom.equinix.com

Who is behind it

OperatorEquinix · Colocation
Funder, EquityEquinix Inc

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$135m to US$183m

No figure has been announced. This range is 24 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Land
Industrial estateSIPCOT IT Park, Siruseri · 5.5 acres · US$9m · leasehold · Mar 2022 Confirmed source ↗
Long-term leasehold. Area and price stated as 'more than'.
Power supply
Power allocation or planJun 2024 Confirmed source ↗
Expected to be 100 percent covered by renewable energy. · No utility or capacity named.
Water and cooling
CoolingAir cooled Reported source ↗
Equinix's patented cool array design. Hot exhaust air is drawn into a cool spine, cooled and recirculated.

Sources

  1. Equinix Opens First AI-Ready Data Center in Chennai (Equinix newsroom, 2025-09-19)
  2. Chennai CN1 (Plot H12, SIPCOT Industrial Park, Siruseri) (Equinix)
  3. Equinix signs MoU with Tamil Nadu government for Chennai data center (DCD, 2022-07-06)
  4. Equinix announces plans for data center in Chennai, India (DCD, 2024-06-25)
  5. Equinix Opens First Phase of Chennai, India Data Centre (Mingtiandi, 2025-09-22)
  6. Equinix Invests Over US$9 Million to Acquire Land in Chennai for Expansion (Equinix, 2022-03-22)
  7. Equinix opens AI-ready data center in Chennai (W.Media, 2025-09-20)
  8. Equinix to Open a Strategic Interconnection Hub in Chennai (Equinix, 2024-06-24)
  9. Equinix India Private Limited CN01 (Telecommunications Industry Association (TIA-942 registry))
  10. Inside Chennai's data centres. Fortresses of the AI era (ThePrint, 2026-02-17)

More in Chennai

Also run by Equinix

Definitions and sourcing rules · CC BY-NC 4.0 · corrections@arusgrid.com