Equinix Jurong Island (DC-CFA2)

Jurong Island, Singapore · Singapore market · location approximate to district level

Equinix Jurong Island (DC-CFA2) is a data center project in Jurong Island, Singapore, operated by Equinix. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.

Latest change on record: entered the record as announced on 21 August 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
Running now
Not disclosed
Operator
Equinix
Colocation
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Open question3 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

How well evidenced is it

One or two hard signals sit behind the announcement. On record: named funder, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusNo signal either way

No AI tenant, workload or design disclosure. The DC-CFA2 award is gated on sustainability criteria rather than a stated AI purpose, so no inference is drawn.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Stage history

2026-08-21Announced · edb.gov.sg

Who is behind it

OperatorEquinix · Colocation
Funder, EquityEquinix

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Land
Allocated byJTC Corporation (Jurong Island low-carbon data centre park) · Aug 2026 Reported source ↗
Provisional 50MW allocation in a park JTC is developing on Jurong Island. Plot size and lease term not disclosed.
Power supply
Power allocation or plan50 MW · Aug 2026 Reported source ↗
Committed >50% of capacity from green energy (biomethane, low-carbon ammonia/hydrogen, BIPV/BAPV) · DC-CFA2 provisional 50MW allocation; liquid cooling, Green Mark DC Platinum required
Renewable power dealFlo Energy Singapore · Aug 2026 Reported source ↗
At least 11.5MWp of rooftop solar across Singapore, with an option to expand to 50MWp. Equinix's fourth Singapore PPA, taking its local portfolio to 215MWp by 2028. · Powers Equinix facilities in Singapore generally. Not tied to the Jurong Island site. Capacity is MWp of solar, not facility load. 11.5MWp minimum. · Covers the operator's wider portfolio in this country, not this site alone.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedIndustrial raw water · Jurong Island utility providers (demineralised water, seawater cooling circuits) source ↗
This project is one of 4 that fit. The others are Digital Realty Jurong Island (DC-CFA2), Keppel DC SGP 11, Jurong Island (DC-CFA2), STT GDC Jurong Island (DC-CFA2).

Sources

  1. Four data centre proposals selected as part of second Data Centre Call for Application (Singapore Economic Development Board, 2026-08-21)
  2. Singapore picks four operators to boost data centre capacity by 200MW (Techgoondu, 2026-08-21)
  3. Singapore gov't allocates 200MW of power for four data center developers on Jurong Island (DatacenterDynamics, 2026-08-21)
  4. Singapore’s DC-CFA2 winners announced; third CFA possible (W.Media, 2026-08-21)
  5. Jurong Island to host Singapore's largest green data centre park; 10 per cent of land set aside for new energies (Singapore Economic Development Board, 2025-10-28)
  6. Why Singapore is building data centers on Jurong Island (W.Media, 2026-07-13)
  7. Equinix signs solar PPA with Flo Energy in Singapore (W.Media, 2026-08-18)

Same campus, Jurong Island Data Centre Park